background image

Mooney 22/22H Pilots Instruction Manual  |  11

Copyright 2022 Baker Hughes Company. All rights reserved.

2. 

 Place Diaphragm Assembly in the pilot body with the 

diaphragm touching the grooved sealing surface of the pilot 

body. (Refer to Figure 11).

Figure 11

 - Placing Diaphragm Assembly on Pilot Body.

3.   Place Spring Housing on Pilot Body with vent connection 

in desired position. The standard factory installation will be 

with the vent facing directly away from the regulator.

Figure 12 

- Placing the Spring Housing on the Pilot Body.

4. 

Install Spring Housing Cap Screws. Use cap screws 

supplied and tighten evenly to 8 ft-lbs (10.8 Nm) torque.

5. 

 Install Spring and Spring Follower. Lubricate Spring 

Follower with a Petroleum Grease such as Lubriplate™ No. 

105.

Figure 13

 - Installing the Spring with lubricated Spring Follower: 

Lubricate with Petroleum Grease such as Lubriplate™ No. 

105.

6.   To avoid galling of adjusting screw, apply a small amount 

of lubricant (such as NEVER SEEZ™ by Bostik to the 

adjusting screw thread.

бA.  

PILOTS WITH THE RED, PLATED, BLUE, AND PURPLE 

       SPRINGS:

 Install Closing Cap with Adjusting Screw and 

 

       Sealing Nut and O-Ring.

Figure 14

 - Installing the closing cap assembly for Pilot with the 

Red, Plated, Blue, and Purple Springs.

Lubricate

Содержание Mooney 22 Series

Страница 1: ...Mooney 22 22H Series Pilots Instruction Manual Rev A Baker Hughes Data Classification Public...

Страница 2: ...LAR REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET...

Страница 3: ...Table of Contents Product Description 4 General Description 5 Pilot Markings Figure 3 7 Series 22 Pilot Piping Schematics Loading Type Valves 8 Series 22 Pilot Loading Type Valve Installation 9 Maint...

Страница 4: ...ax HP actuator in gas applications Series 22 Stainless steel construction with a 3 to 450 psig 0 2 barg 31 barg control pressure range Series 22H High pressure stainless steel construction with a 200...

Страница 5: ...lnlet and Loading Ports 3 The INLET port is where upstream supply pressure is connected to the Series 22 Pilot Assembly The LOADING port is used to connect the controlling signal from the pilot to th...

Страница 6: ...0 F 29 C to 66 C Emergency 40 F to 200 F 40 C to 93 C Maximum Inlet Pressure 1500 psig 100 barg Maximum Loading Pressure 1500 psig 100 barg Maximum Outlet Pressure 1500 psig 100 barg Maximum Emergency...

Страница 7: ...5 Nameplate for Series 22 Pilots Figure 6 Spring Range Nameplate for Series 22H Pilots Table 4 Item Definition Mooney Pilot Trademarked name of pilot Series Model number of pilot Control Pressure The...

Страница 8: ...tubing from filter OUTLET connection to the Series 22 pilot INLET port 2 Type 30 filter mounted in inlet piping 3 LOADING port of Series 22 pilot connected to Loading connection on the actuator housi...

Страница 9: ...l sales representative for ordering information 1 PERSONNEL Installation of the Series 22 Pilot on the FlowMax Valve or any other manufacturer valve should be made by qualified personnel familiar with...

Страница 10: ...fely release pressure and process fluid from the regulator body and pilot system Failure to properly complete these steps may result in personal injury and property damage 1 After depressurizing the p...

Страница 11: ...t Body 4 Install Spring Housing Cap Screws Use cap screws supplied and tighten evenly to 8 ft lbs 10 8 Nm torque 5 Install Spring and Spring Follower Lubricate Spring Follower with a Petroleum Grease...

Страница 12: ...bricate both Body Insert O Rings with Parker Super O Lube or equivalent Petroleum based Lubricant and install on Body Insert Cartridge 9 Body Insert Assembly Lift Bottom Cap complete with valve mechan...

Страница 13: ...20 HP Diaphragm Assembly NOTE Over tightening will distort the Pilot Diaphragm 2 Place Diaphragm Assembly in the pilot body with the diaphragm touching the grooved sealing surface of the pilot body a...

Страница 14: ...block after separation from the Series 22 block Figure 25 Restrictor Block Assembly The check valve can be removed from the Restrictor block while attached to the Series 22 block Care should be taken...

Страница 15: ...Mooney 22 22H Pilots Instruction Manual 15 Copyright 2022 Baker Hughes Company All rights reserved Notes...

Страница 16: ...com Copyright 2022 Baker Hughes Company All rights reserved Baker Hughes provides this information on an as is basis for general information purposes Baker Hughes does not make any representation as t...

Отзывы: