background image

6  |  Baker Hughes

Copyright 2022 Baker Hughes Company. All rights reserved.

Table 1.

 Materials of Construction Series 22 and 22H

Body & Spring Housing

Stainless Steel

Body Insert & Closing Cap

Stainless Steel

Diaphragm Spacer Assembly

Stainless Steel

Orifice

Stainless Steel or Delrin

Plug & Stem

Nitrile/Stainless Steel

FKM/Stainless Steel
Stainless Steel

Diaphragm

Nitrile/Nylon or FKM/Nylon

O-Rings

Nitrile or Viton

FKM Table 2.

Specifications All Series 22 Pilots

Control Application

Pressure Reducing (PRV) 

Orifice Size

0.15 in (3.81 mm)

Connections

1/4 in NPT

Temperature

Working -20°F to 150°F (-29 °C to 66°C)

 

Emergency -40°F to 200°F (-40°C to 93°C)

Maximum Inlet Pressure

1500 psig (100 barg)

Maximum Loading Pressure

1500 psig (100 barg)

Maximum Outlet Pressure

1500 psig (100 barg)

Maximum Emergency Sensing Pressure

1000 psig (70 barg)

Maximum Spring Housing Pressure

1000 psig (70 barg)

Set Pressure Range

3-900 psig (0.2 - 62 barg) 

1

1.  Refer to Table 3 for specific spring ranges.

Table 3.

Specifications

Series

Spring Range

Color

Part Number

22

  3  -  12 psig       (0.2 - 0.8 barg)

Red

040-014-01

  10  -  40 psig        (0.7 - 2.7 barg)

Plated

040-011-01

  25  -  90 psig        (1.7 - 6.2 barg)

Blue

040-012-01

  60  -  200 psig   (4 - 14 barg)

Purple

040-008-01

 100  -  260 psig   (7 - 18 barg)

Black

040-009-01

 200  -  450 psig   (14 - 31 barg)

White/Green

040-020-01

22H

 200  -  520 psig  (14 - 36 barg)

Black

040-009-01

 400  -  900 psig   (27 - 62 barg)

White/Green

040-020-01

Содержание Mooney 22 Series

Страница 1: ...Mooney 22 22H Series Pilots Instruction Manual Rev A Baker Hughes Data Classification Public...

Страница 2: ...LAR REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET...

Страница 3: ...Table of Contents Product Description 4 General Description 5 Pilot Markings Figure 3 7 Series 22 Pilot Piping Schematics Loading Type Valves 8 Series 22 Pilot Loading Type Valve Installation 9 Maint...

Страница 4: ...ax HP actuator in gas applications Series 22 Stainless steel construction with a 3 to 450 psig 0 2 barg 31 barg control pressure range Series 22H High pressure stainless steel construction with a 200...

Страница 5: ...lnlet and Loading Ports 3 The INLET port is where upstream supply pressure is connected to the Series 22 Pilot Assembly The LOADING port is used to connect the controlling signal from the pilot to th...

Страница 6: ...0 F 29 C to 66 C Emergency 40 F to 200 F 40 C to 93 C Maximum Inlet Pressure 1500 psig 100 barg Maximum Loading Pressure 1500 psig 100 barg Maximum Outlet Pressure 1500 psig 100 barg Maximum Emergency...

Страница 7: ...5 Nameplate for Series 22 Pilots Figure 6 Spring Range Nameplate for Series 22H Pilots Table 4 Item Definition Mooney Pilot Trademarked name of pilot Series Model number of pilot Control Pressure The...

Страница 8: ...tubing from filter OUTLET connection to the Series 22 pilot INLET port 2 Type 30 filter mounted in inlet piping 3 LOADING port of Series 22 pilot connected to Loading connection on the actuator housi...

Страница 9: ...l sales representative for ordering information 1 PERSONNEL Installation of the Series 22 Pilot on the FlowMax Valve or any other manufacturer valve should be made by qualified personnel familiar with...

Страница 10: ...fely release pressure and process fluid from the regulator body and pilot system Failure to properly complete these steps may result in personal injury and property damage 1 After depressurizing the p...

Страница 11: ...t Body 4 Install Spring Housing Cap Screws Use cap screws supplied and tighten evenly to 8 ft lbs 10 8 Nm torque 5 Install Spring and Spring Follower Lubricate Spring Follower with a Petroleum Grease...

Страница 12: ...bricate both Body Insert O Rings with Parker Super O Lube or equivalent Petroleum based Lubricant and install on Body Insert Cartridge 9 Body Insert Assembly Lift Bottom Cap complete with valve mechan...

Страница 13: ...20 HP Diaphragm Assembly NOTE Over tightening will distort the Pilot Diaphragm 2 Place Diaphragm Assembly in the pilot body with the diaphragm touching the grooved sealing surface of the pilot body a...

Страница 14: ...block after separation from the Series 22 block Figure 25 Restrictor Block Assembly The check valve can be removed from the Restrictor block while attached to the Series 22 block Care should be taken...

Страница 15: ...Mooney 22 22H Pilots Instruction Manual 15 Copyright 2022 Baker Hughes Company All rights reserved Notes...

Страница 16: ...com Copyright 2022 Baker Hughes Company All rights reserved Baker Hughes provides this information on an as is basis for general information purposes Baker Hughes does not make any representation as t...

Отзывы: