9 | BHGE
© 2018 Baker Hughes, a GE company. All Rights
Reserved.
Table 1: Assembly Torque Requirements
Valve Size
ANSI
Class
Bolting Requirements
Torque Requirements
Minimum
Maximum
Pre-Load
Inch
mm
Qty
.
Size (inch)
Lbs.F
t
N.m Lbs.F
t
N.m Lbs.F
t
N.m
¾
20
150 & 300
6
½"-13NC-2A
25
34
55
75
5
7
600
6
½"-13NC-2A
25
34
55
75
5
7
1
25
150 & 300
6
½"-13NC-2A
25
34
55
75
5
7
600
6
½"-13NC-2A
25
34
55
75
5
7
1½
40
150 & 300
6
½"-13NC-2A
25
34
55
75
5
7
600
6
½"-13NC-2A
25
34
55
75
5
7
2
50
150 & 300
8
½"-13NC-2A
25
34
55
75
5
7
600
8
½"-13NC-2A
25
34
55
75
5
7
3
80
150 & 300
8
5
/
8
“-11NC-2A
45
61
89
120
10
14
600
8
5
/
8
“-11NC-2A
45
61
89
120
10
14
4
100
150 & 300
8
¾”-10NC-2A
80
108
170
230
20
27
600
8
¾”-10NC-2A
80
108
170
230
20
27
Notes: 1. Do not exceed Maximum Torque values listed.
2. Tighten in increments until required torque levels are reached.
3. Reject assembly if metal-to-metal contact is not achieved after reaching Maximum Torque.
4. Torque requirements shown are for standard B7 studs and 2H nuts.
Figure 4: Bolt Pinning Dimensions
Figure 5: Bolt Tightening Sequence
Содержание Masoneilan 525
Страница 4: ......