(PERMANENTLY CONNECTED UNITS)
The following instructions are for the connection of an Control Module operated at 240 volts / 50 amperes
1. Open the Control Module wiring access panel to allow access to the input terminal block.
2.
PerformanceXS & WhiteWaterXS::
A minimum supply conductor ampacity of 50 amperes and a GFCI
circuit breaker size 50 amperes is required.
3. Connect input wiring as shown. The Command Center requires a
4 Wire service (L1, L2,
NEUTRAL)
110 volt accessories such as Fiber Optics, BXS Stereo System, Yard Lighting can be added.
4.
Close the wiring access panel.
4 WIRE INSTALLATION
240 Volt
GFCI Circuit Breaker Size - 50AMP
240 VOLT INSTRUCTIONS
NOTE: USE COPPER CONDUCTORS ONLY!
Note:
Have a licensed & qualified electrician
perform electrical wiring. Check with
local codes and/or National Electrical
Code Standards (NEC)
MINIMUM WIRE SIZE FOR LINE 1, LINE 2,
NEUTRAL = #6 AWG.
MINIMUM WIRE SIZE FOR GROUND = #10 AWG
*Refer to local codes for exact wiring size required
240-Volt electrical service requires:
Line 1, Line 2, Neutral and Ground.
240 VOLT WIRING DIAGRAM
(3-Wire Systems Plus Ground)
IMPORTANT: Always refer to the product data label (located on
top of control box) for specific electrical information.
Ground-Fault Circuit-Interrupters and Load Neutral Connection
Most 240 volt panel mounted Ground-Fault Circuit-
Interrupter’s (GFCI’s) are provided with a “LINE”
neutral connection lead. Since the GFCI itself is a 120
volt device, this wire must be connected to the neutral
buss bar in order for the GFCI to function properly.
Many GFCI’s are also provided with a “LOAD” neutral
connection terminal. The purpose of the “LOAD”
neutral connection terminal is to allow the connection
of 120 volt devices to the 240 volt GFCI. If the circuit
being connected does not contain any 120 volt
devices, the LOAD neutral connection is not used, and
the GFCI will provide protection of all 240 volt devices
connected. A ”LOAD” neutral terminal connection is
NOT needed in order for the GFCI to function.
GROUND FAULT INTERRUPTER
7
GFCI
TEST
(Ground Fault Circuit Interrupter)
CIRCUIT BREAKER
N
EU
TR
A
L
P
IG
TA
IL
N
E
U
TR
A
L
B
U
S
B
A
R
LINE 1
NEUTRAL
LINE 2
GROUND
GROUND BUS BAR
LINE LUG #1
LINE LUG #2
LINE 1
LINE 2
INCOMING
SERVICE
CONDUCTORS
FROM
MAIN
PANEL
NEUTRAL
GROUND
TO SPA CONTROL BOX
LOAD
LOAD NEUTRAL MUST BE
CONNECTED DIRECTLY
TO GFCI AS SHOWN
P
6
9
P
7
0
P
7
1
P
7
2
P
7
3
P
7
4
P
7
5
P64
P1H
P51
P40
P46
P48
P45
P41
P47
P49
P50
P
3
7
P35
P31
P39
`
P22
P17
P21
P12
P11
P15
P16
P
2
4
P
2
8
P
3
0
P
3
4
P
3
6
P53
P58
P57
P55
P60
P59
P61
P50
P44
P63
P
4
4
PUMP 1
PUMP 2
PUMP 3
F/O
SYSTEM
CP/OZONE
BLOWER
SPASIDE
AUXILIARY
TEMP
I/
R
-
H
L
FLOW
L
IG
H
T
1
2
V
H
I-
L
IM
IT
LIGHT
GROUND
CONNECTIONS
NEUTRAL
CONNECTIONS
LINE 2
CONNECTIONS
LINE 1
CONNECTION
HEATER
LINE 2
HEATER
LINE 1
ADIR-4 COMMUNICATION
FOR PALM PILOT
X-FORMER
LOW VOLTAGE
X
-F
O
R
M
E
R
H
I
V
O
LT
A
G
E
SPA
WATCH
F/O
LINE 2
LINE 1
NEUT.
GRND
Содержание Whitewater XS
Страница 20: ...NOTES SPA SCHEMATIC 19...