INTRODUCTION
I-E96-417A
3 - 1
SECTION 3 - MAINTENANCE
INTRODUCTION
The NTCU01 Serial Interface Termination Unit requires mini-
mal maintenance. Doing the tasks in Table
will provide
long, trouble free service. Please note that only qualified per-
sonnel should perform maintenance.
MAINTENANCE SCHEDULE
Table
is the maintenance schedule. These tasks are to be
performed at the specified intervals.
Table 3-1. Maintenance Schedule
Task
Interval
Clean and tighten all cable and
power connections.
Every 6 months or during plant
shutdown, whichever occurs first.
Use a static safe vacuum cleaner
to remove dust from:
Termination units
Field termination panel