INSTALLATION
UNPACKING AND INSPECTION
2 - 2
I-E96-417A
®
UNPACKING AND INSPECTION
1. Examine the termination module immediately for any ship-
ping damage.
2. Notify the nearest Bailey Controls sales office of any
damage.
3. File a claim for any damage with the transportation com-
pany that handled the shipment.
4. Use the original packing material or container to store the
termination module.
5. Store the module in an environment of good air quality, free
from temperature and moisture extremes.
INSTALLING THE TERMINATION UNIT
The serial interface termination unit (TCU) is ready to install.
There are no jumpers to set on the TCU circuit board.
MOUNTING THE TERMINATION UNIT
To mount the termination unit:
1. Insert the tabs of the circuit board into the proper slots of
the termination panel standoff (see Figure
) and slide the
circuit board into position.
2. Secure the termination unit circuit board to the field termi-
nation panel with two number 10 screws (see Figure
).
3. Connect the chassis ground to the field termination panel
by installing a number 10 self-tapping sheet metal screw and
star washer through E2 on the TCU circuit board. See Figures
and
CABLE INSTALLATION
Termination Unit Cables
After mounting the termination unit to the field termination
panel, install the termination cable. Table
lists the termi-
nation cable, its application, connector assignment and length
restrictions. Figure
shows a diagram of cable connections
to the TCU termination unit. To install the termination unit
cable:
1. Insert the socket connector end of the cable into P1 on the
TCU circuit board. See Figure
TCU circuit board.