INTRODUCTION
I-E96-314A
3 - 1
SECTION 3 - INSTALLATION
INTRODUCTION
This section covers the proper handling of electrostatic sensi-
tive devices, slave module installation and configuration. Read
and do the steps in this section before placing the Frequency
Counter Slave (FCS) into operation. Refer to
(Related
Documents) for a list of documents needed to configure the
MFP to function with the FCS.
HANDLING
Special Handling
The slave uses Electrostatic Sensitive Devices (ESD). Follow
these handling procedures:
1. Always wear the wrist ground strap when handling any cir-
cuit board.
2. Keep the module in the special anti-static bag until you are
ready to install it in the system. Save the bag for future use.
3. Ground the anti-static bag before opening.
4. Verify that all devices connected to the module are properly
grounded before using them.
5. Avoid touching the circuitry when handling the modules.
General Handling
1. Examine the module immediately to verify that no damage
has occurred in transit.
2. Notify the nearest Bailey Controls Sales Office of any
damage.
3. File a claim with the transportation company for any dam-
age to the shipment.
NOTICE
Always use Bailey's Field Static Kit (Kit P/N 1948385A2 - con-
sisting of wrist strap, ground cord assembly and alligator clip)
when working with modules. The kit is designed to connect a
technician and the static dissipative work surface to the same
ground point to prevent damage to the modules by electro-
static discharge.