background image

 

 

13 

ASSIGNMENT 

13.1  The Buyer shall not be entitled to assign the Contract or any part of it without the prior written consent of the Company. 
13.2  The Company may assign the Contract or any part of it to any person, firm or company. 

 

14 

FORCE MAJEURE 

The Company reserves the right to defer the date of delivery or to cancel the Contract or reduce the volume of the Goods ordered by the 
Buyer (without liability to the Buyer) if it is prevented from or delayed in the carrying on of its business due to circumstances beyond the 
reasonable control of the Company including, without limitation, acts of God, governmental actions, war or national emergency, riot, civil 
commotion, fire, explosion, flood, epidemic, lock-outs, strikes or other labour disputes (whether or not relating to either party's workforce), 
or  restraints  or  delays  affecting  carriers  or  inability  or  delay  in  obtaining  supplies  of  adequate  or  suitable materials  Provided  that,  if  the 
event  in  question  continues  for  a  continuous  period  in  excess  of  [180]  days,  the  Buyer  shall  be  entitled  to  give  [not  less  than  [3]  days] 
notice in writing to the Company to terminate the Contract. 

 

15 

GENERAL 

15.1  Each right or remedy of the Company under the Contract is without prejudice to any other right or remedy of the Company whether 

under the Contract or not. 

15.2  If any provision of the Contract is found by any court, tribunal or administrative body of competent jurisdiction to be wholly or partly 

illegal, invalid, void, voidable, unenforceable or unreasonable it shall to the extent of such illegality, invalidity, voidness, voidability, 
unenforceability  or  unreasonableness  be  deemed  severable  and  the  remaining  provisions  of  the  Contract  and  the  remainder  of 
such provision shall continue in full force and effect. 

15.3  Failure or delay by the Company in enforcing or partially enforcing any provision of the Contract will not be construed as a waiver of 

any of its rights under the Contract. 

15.4  Any waiver by the Company of any breach of, or any default under, any provision of the Contract by the Buyer will not be deemed a 

waiver of any subsequent breach or default and will in no way affect the other terms of the Contract. 

15.5  The  parties  to  this  Contract  do  not  intend  that  any  term  of  this  Contract  will  be  enforceable  by  virtue  of  the  Contracts  (Rights  of 

Third Parties) Act 1999 by any person that is not a party to it. 

15.6  The formation, existence, construction, performance, validity and all aspects of the Contract shall be governed by English law and 

the parties submit to the exclusive jurisdiction of the English courts. 

 

16 

COMMUNICATIONS 

16.1  All communications between the parties about this Contract must be in writing and delivered by hand or sent by pre-paid first class 

post or sent by facsimile transmission: 

16.1.1 

(in  case  of  communications  to  the  Company)  to  its  registered  office  or  such  changed  address  as  shall  be  notified  to  the 
Buyer by the Company; or  

16.1.2 

(in the case of the communications to the Buyer) to the registered office of the addressee (if it is a company) or (in any other 
case) to any address of the Buyer set out in any document which forms part of this Contract or such other address as shall 
be notified to the Company by the Buyer. 

16.2  Communications shall be deemed to have been received: 

16.2.1 

if sent by pre-paid first class post, 2 days (excluding Saturdays, Sundays and bank and public holidays within the UK) after 
posting (exclusive of the day of posting); 

16.2.2 

if delivered by hand, on the day of delivery; 

16.2.3 

if sent by facsimile transmission on a working day prior to 4.00 p.m., at the time of transmission and otherwise on the next 
working  day.  Communications  addressed  to  the  Company  shall  be  marked  for  the  attention  of  the  designated  purchasing 
agent for the buyer. 

 

17 

EXPORT 

17.1 

In these Conditions “Incoterms” means the international rules for the interpretation of trade terms of the International Chamber of 
Commerce as in force at the date when the Contract is made.  Unless the context otherwise requires, any term or expression which 
is defined in or given a particular meaning by the provisions of Incoterms shall have the same meaning in these Conditions, but if 
there is any conflict between the provisions of Incoterms and these Conditions, the latter shall prevail. 

17.2  Where the Goods are supplied for export from the United Kingdom, the provisions of this Condition 17 shall (subject to any special 

terms agreed in writing between the Buyer and the Company) apply notwithstanding any other provision of these Conditions. 

17.3  The  Buyer  shall  be  responsible  for  complying  with  any  legislation  or  regulations  governing  the  importation  of  the  Goods  into  the 

country of destination and for the payment of any duties on them. 

17.4  Unless  otherwise  agreed in writing  between  the Buyer  and the  Company, the  Goods shall  be  delivered  fob the  air  or sea  port  of 

shipment and the Company shall be under no obligation to give notice under section 32(3) of the Sale of Goods Act 1979. 

17.5 

The Buyer shall be responsible for arranging for testing and inspection of the Goods at the Company’s premises before shipment. 
The Company shall have no liability for any claim in respect of any defect in the Goods which would be apparent on inspection and 
which is made after shipment, or in respect of any damage during transit. 

 
 
 
 

Содержание TN-800

Страница 1: ...Pty LTD IS PROHIBITED Baileigh Industrial Pty LTD does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual resulting from acc...

Страница 2: ...19 Cutter Selection 19 Material Insertion 20 Setting Offset 21 Notching 22 Angle Notching 22 Repeat Notching 23 Material Removal 23 Off Center Notching 23 MATERIAL SELECTION 24 STANDARD PIPE SIZES AN...

Страница 3: ...designated agent employee of the Company 2 4 The Buyer must ensure that the terms of its order and any applicable specification are complete and accurate 2 5 Any quotation given by the Company is an o...

Страница 4: ...y except a solvent voluntary liquidation for the purpose only of reconstruction or amalgamation or has a receiver and or manager administrator or administrative receiver appointed of its undertaking o...

Страница 5: ...9 9 All electrical components and gearboxes carry a one year replacement warranty from the manufacturer This warranty does not include labour or shipping costs 10 RETURNS 10 1 The Buyer shall not be e...

Страница 6: ...of the English courts 16 COMMUNICATIONS 16 1 All communications between the parties about this Contract must be in writing and delivered by hand or sent by pre paid first class post or sent by facsimi...

Страница 7: ...tion of the functional parts of the machine Capacity charts Set up and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remove the...

Страница 8: ...es a hazard or unsafe practice that will result in severe Injury or Death Safety signs with signal word DANGER or WARNING are typically near specific hazards General precautions are listed on CAUTION...

Страница 9: ...against objectionable or uncomfortable loud noises BEWARE OF PINCH POINTS Keep hands and fingers away from the slide plate and pivot points when operating on and around this machine Keep chuck guard...

Страница 10: ...remely dangerous if you do not follow proper safety procedures NEVER place hands directly over or in front of the cutter Keep the tooling guard in place and closed at all times while operating this ma...

Страница 11: ...tools Before operating the machine make sure any adjusting tools have been removed 4 Keep work area clean Cluttered areas invite injuries 5 Overloading machine By overloading the machine you may cause...

Страница 12: ...roperly adjusted for optimum performance 16 Keep children away Children must never be allowed in the work area DO NOT let them handle machines tools or extension cords 17 Store idle equipment When not...

Страница 13: ...subject line Tech Support handles questions on machine setup schematics warranty issues and individual parts needs other than die sets and blades List the model number serial number and contact name a...

Страница 14: ...y damage painted surfaces Follow manufacturer s label instructions when using any type of cleaning product After cleaning wipe unpainted metal surfaces with a light coating of quality oil or grease fo...

Страница 15: ...securing bolts that attach the machine to the pallet Approaching the machine from the side lift the machine on the frame taking care that there are no cables or pipes in the area of the forks Move the...

Страница 16: ...o consideration the size of the material to be processed Make sure that you allow enough space for you to operate the machine freely POWER SUPPLY PLACEMENT The power supply should be located close eno...

Страница 17: ...schedules and producing greater profits The TN 800 is an electric powered end mill notching machine specially designed to notch a variety of materials using only one end mill The Patented Eccentric C...

Страница 18: ...shown Used to move the vise bed into and away from the end mill F Vise Used to hold and secure the material to be notched May be rotated to feed the material into the end mill at an angle from 0 45 G...

Страница 19: ...will damage the motor In the event of a malfunction or breakdown grounding provides a path of least resistance for electric current to reduce the risk of electric shock This tool is equipped with an...

Страница 20: ...etely understood or if in doubt as to whether the tool is properly grounded Repair or replace damaged or worn cord immediately Extension Cord Safety Extension cord should be in good condition and meet...

Страница 21: ...talled This will notch from 1 2 12 7mm up to 1 25 4mm diameter material 3 To install the cutter first unplug the power cord and open the Lexan guard 4 Loosen the set screws A located on the spindle an...

Страница 22: ...angle not to exceed 45 deg DO NOT rotate the vise so that the lead screw B in in front of the end mill 5 Using the X and Y hand wheels position the material up to the cutter leaving about 1 2 12 7mm o...

Страница 23: ...lines B up with the red indicator at the 12 o clock position 4 At this point all offset adjustments and table positioning will be made this is also the start and end point of every notch 5 On the face...

Страница 24: ...d notch depth is achieved 5 Alternate depth notch if you know how deep you need to notch mark that depth on the material Rotate the red indicator to the 6 o clock position then feed with the X handwhe...

Страница 25: ...is Counter display Actual distance in inches 0000 0 0 000 0001 0 0 100 0002 0 0 200 Material Removal 1 After the desired notch depth is reached activate the stop switch 2 Make sure the spindle has st...

Страница 26: ...and Wall Thickness 5 10 40 80 160 XX STRONG 1 8 0 405 0 400 0 050 0 068 0 095 1 4 0 540 0 500 0 070 0 088 0 119 3 8 0 675 0 500 0 070 0 091 0 126 1 2 0 840 0 700 0 080 0 109 0 147 0 188 0 294 3 4 1 05...

Страница 27: ...set too loose V rollers set too loose Motor stops while notching Feeding to fast Cutter is dull Not a good power source circuit should be dedicated to this machine only Main handwheel is tight or sti...

Страница 28: ...26 26 ELECTRICAL SCHEMATIC...

Страница 29: ...ll decrease the performance of the machine and may be unsafe Periodically check the power cord for cuts or bare wire and replace if damaged Oil Disposal Used oil products must be disposed of in a prop...

Страница 30: ...28 28 PARTS DIAGRAM Base Assembly...

Страница 31: ...29 29 Spindle Assembly...

Страница 32: ...30 30 Forward Riser Assembly...

Страница 33: ...31 31 Motor and Gearbox Assembly...

Страница 34: ...32 32 Rear Riser Assembly...

Страница 35: ...33 33 Crank Shaft Assembly...

Страница 36: ...34 34 Vise Assembly...

Страница 37: ...35 35 Slide Base Assembly...

Страница 38: ...washer 4 14 Imperial 1 2 13 Hex Nut 3 15 ME M800 6A005 Support Disc 1 16 ME M800 7A005 Tapping Plate 1 17 ME M800 6A006 Tie Block 1 18 M10 X 1 5 X 20 SHCS 2 19 ME M800 7A007 Sprocket Spacer 3 20 M800...

Страница 39: ...M10 X 1 5 X 30 SHCS 2 49 ME M800 6A015 Pointer 1 50 M800 5A002 Indicator Plate 1 51 M5 X 0 8 X 20 SHCS 2 52 M6 X 1 0 X 25 SHCS 3 53 PP 0042 39 40 Chain 1 54 Imperial M20 X 2 5 X 20 Set Screw 2 55 Impe...

Страница 40: ...018 Short Lead Screw 1 84 ME M800 6A070 4 75 Gib Thick 1 85 ME M800 6A071 4 75 Gib Thin 1 86 M8 X 1 25 X 30 SHCS 6 87 ME M800 6A069 Gib Thin 1 88 ME M800 6A068 Gib Thick 1 89 M800 6A037 Vise Casting 1...

Страница 41: ...6 PP 1296 CE On Off Switch 1 117 M800 6A046 Sprocket Guard 1 118 M5 X 0 8 X 10 PPMS 5 119 Imperial 1 2 13 X 2 75 Hex Bolt 1 120 M800 6A060 Moveable Vise Clamp 1 121 M800 7A025 Shoulder Washer 2 122 PP...

Страница 42: ...40 40 NOTES...

Страница 43: ...41 41 NOTES...

Страница 44: ...NUE ONTARIO CA 91761 PHONE 920 684 4990 FAX 920 684 3944 BAILEIGH INDUSTRIAL LTD UNIT D SWIFT POINT SWIFT VALLEY INDUSTRIAL ESTATE RUGBY WEST MIDLANDS CV21 1QH UNITED KINGDOM PHONE 44 0 24 7661 9267 F...

Отзывы: