10
10
TRANSPORTING AND LIFTING
Follow these guidelines when lifting:
Always lift and carry the machine with the lifting holes provided at the top of the machine.
Use a steel chain capable of lifting 10,000 lbs. (4536 kg) min.
Take proper precautions for handling and lifting.
Check if the load is properly balanced by lifting it an inch or two.
Lift the machine, avoiding sudden accelerations or quick changes of direction.
Locate the machine where it is to be installed, and lower slowly until it touches the floor.
CAUTION:
Lifting and carrying
operations should be carried out by skilled
workers, such as a truck operator, crane
operator, etc. If a crane is used to lift the
machine, attach the lifting chain carefully,
making sure the machine is well balanced.
Choose a location that will keep the brake
free from vibration and dust from other
machinery. Keep in mind that having a
large clearance area around the machine is
important for safe and efficient working
conditions.
7260 lbs
(3300 kg)
Содержание SH-8008HD
Страница 19: ...16 16 GETTING TO KNOW YOUR MACHINE I D E H J K A C O O P...
Страница 44: ...41 41 HYDRAULIC CYLINDER EXPLODED VIEW 14 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24...
Страница 47: ...44 44 ELECTRICAL ENCLOSURE BACK PANEL...
Страница 57: ...54 54 NOTES...
Страница 58: ...55 55 NOTES...
Страница 59: ...56 56 NOTES...