Initial Startup

Once the assembling, mounting and installation of the micro::station / nano::station have been completed and 

checked (see chapter 4) the initial startup of the s::can monitoring system will require the following actions, in the 

order presented below:

 

Ensure that all protective caps are removed from the sensors and the sensors are ready for use.

 

Check the tube connections from the compressor to the cleaning valves and from the cleaning valves to 

the probes / sensors when using a waste water station with compressed air cleaning.

 

Connect the spectrometer probe and all sensors to the controller used for operation (see manual of the 

used controller).

 

If a compressor is used, establish power supply to the compressor.

 

Establish power supply to the controller for operation (see section 5.1 and manual of the controller for ope

-

ration) and wait until the operation software has started up.

 

The spectrometer probe and all sensors are already installed on the controller for operation, So readings of 

the single parameters will be displayed immediately.

 

Open the valve on the inlet to fill micro::station / nano::station with water.

 

Check if water outlet from the station is contiuous and as expected (see section 8.1).

 

Check if no air bubbles are present within the monitoring station (see section 8.1).

 

Configure the measurement and automatic cleaning settings (please refer to the manual of the controller 

for operation).

 

Check the proper functioning of the cleaning system

 

Connection and parameterisation of data transfer when desired (please refer to the manual of the control

-

ler for operation).

 

Check the plausibility of the readings obtained after sufficient running-in time (at least 15 minutes). 

 

If necessary calibrate the readings of the i::scan to the local water matrix when the readings are stable (see 

chapter 6 in the manual of the sensor).

5.2 

Connection of Power Supply

!

This type of work must be performed by authorised persons only! (see section 2). 

Depending on the device type, the controller for operation and if necessary the compressor have to be connected 

to the appropriate power supply. The connection of power supply (AC or DC, respectively), must be done with an 

earthed conductor wire (PE - „protective earth“)! 

The power supply earth (PE) is to be made properly and is required for AC and DC operation. Proper grounding 

implies suitable wiring for grounding which includes proper wire size (see technical specification) and a suitable 

equipment ground. Process medium (e.g. waste water) must be connected to the same earth ground with less 

than 0.5 Ohm.

!

The power supply cable must be rated for an ambient temperature of min. 85°C.

!

A switch or circuit-breaker must be included in the power supply. It must be suitable located and easily re

-

achable. It must be marked as a disconnecting device for the monitoring equipment.

!

The power supply terminals of con::cube or con::lyte shall not be used to forward main power supply to the 

compressor. Especially when the compressor starts up high electrical disturbances are induced. If the po

-

wer cable of the compressor is connected inside the con::cube or con::lyte the disturbances are directly led 

into the con::cube or con::lyte with sensitive digital and analogue components.

micro::station / nano::station, 03-2023 Release

www.s-can.at

Copyright © s::can GmbH

17 / 36

Содержание scan micro station

Страница 1: ...Manual micro station nano station March 2023 Release S 36 M...

Страница 2: ......

Страница 3: ...45 ALARM 18 5 2 1 Connection of flow detector F 45 ALARM to con lyte D 320 18 5 2 2 Connection of flow detector F 45 ALARM to con cube 19 5 3 Connection of Pressure Sensor F 500 P 21 5 3 1 Connection...

Страница 4: ...3 Process Connection 30 9 4 Flow Detector 30 9 5 Inlet Strainer 31 9 6 Flow Restrictor 31 9 7 Pressure Sensor 32 9 8 Water Pump 32 9 9 Service Set 33 10 Technical Specifications 34 micro station nano...

Страница 5: ...an by s can This original manual serves as the reference in case discrepancies occur in versions of the manual after translation into third languages This manual and all information and figures contai...

Страница 6: ...self the local legislation and requirements e g regarding electrical connection are observed All s can products are leaving our factory in immaculate technical and safety conditions Inappropriate or n...

Страница 7: ...d a flow restrictor ensures correct pressure and discharge A flow detector alarms when the flow is too low The water leaves the station pressure free free atmosphere With the help of a shut off valve...

Страница 8: ...NANO 8 8 parameters Turbidity TOC UV254 color EC pH 2 disinfection parameters alarm mounted on panel with flow cell autobrush flow detector and con cube operator terminal event detection software incl...

Страница 9: ...s can stations has been optimized Modified dimensions or similar are marked with the note version since 2023 micro station waster water figure on the right micro station nano station 03 2023 Release w...

Страница 10: ...g valve Flow detector digital Process concection Inlet strainer Flow cells for waste water Pressure sensor analog i scan Flow restrictor Flow cell for i scan with autobrush and 2 sensors incl flow res...

Страница 11: ...water in mm For the version until the end of 2022 the total width of the panel is 450 mm The inlet is 135 mm and the outlet 290 mm from the left edge micro station nano station 03 2023 Release www s...

Страница 12: ...Dimensions of micro station waste water in mm micro station nano station 03 2023 Release Copyright s can GmbH www s can at 12 36...

Страница 13: ...mm For the version until the end of 2022 the vertical spacing of the mounting holes is 730 mm The outlet was via the floor outlet of the flow cell micro station nano station 03 2023 Release www s can...

Страница 14: ...eated as household waste It must be disposed and recycled as electronic waste Please assist to keep our environmen 3 5 Scope of Delivery Immediately upon receipt please check the received consignment...

Страница 15: ...ical specifications located at the end of this manual Infrastructure Power supply for controller for operation operational reliability voltage power peak free Correct dimensioning mounting and protect...

Страница 16: ...probes and sensors are to be installed in the flow cells provided which are already mounted on the panel This is done according to the mounting instructions chapter 4 of the respective manuals of the...

Страница 17: ...o the manual of the control ler for operation Check the plausibility of the readings obtained after sufficient running in time at least 15 minutes If necessary calibrate the readings of the i scan to...

Страница 18: ...ght button to switch to the Status display Push the Function button Select the menu Manage sensors and confirm with OK Select the men Add sensor and confirm with OK Select the menu Add digital in and...

Страница 19: ...addition create a cable bridge between 12 VDC red terminal at the bottom of the con cube and the digital input see figure on the right Reconnect the con cube to the power supply and wait until moni t...

Страница 20: ...low Enter the Text for value 0 e g no flow Enter the Text for value 1 e g flow OK Push the button Save to store the configura tion 6 7 8 9 6 7 8 9 micro station nano station 03 2023 Release Copyright...

Страница 21: ...h OK The successful installation is confirmed with ADDED in the top line Push the Back button to return to the menu Sensor configuration Select the menu Configure and confirm with OK Select the entry...

Страница 22: ...om of the con cube with the positiv input e g 1 of the used analog input Analog In with a cable bridge Reconnect the con cube to the power supply and wait until moni tool has started up Click the Serv...

Страница 23: ...number of decimal places Reso lution to 2 Set the Upper limit to 10 and the Lower limit to 0 Check if the Mode is set to 4 20mA and the Error Mode is set to Limit Push the button Save to store the se...

Страница 24: ...word admin1 or your individual user name Click on the icon Outputs and click on the menu entry Digital Outputs in the new window Click on the icon Edit for the 1 digital output digitalOut1 Push the bu...

Страница 25: ...relay e g 45 Relay 1 NO Connect the 12 V power supply of the con cube red terminals at the bottom of the con cube with a cable bridge to the other input e g 46 Relay 1 C of the used digital relay Che...

Страница 26: ...tion itself includes the following steps see also section 8 for typical error patterns Check if any leakage is visible on the flow cells or hose connections screw fittings Check and clean the strainer...

Страница 27: ...e mode on the operator terminal Close the inlet valve Unscrew the transparent cover of the inlet strainer Remove the filter sieve Clean all parts of the inlet strainer with tap water Check the filter...

Страница 28: ...e waiting time after compressed air cleaning Extend discharge 8 2 Return Consignment RMA Return Material Authorization Return consignments of the s can monitoring system or parts of the system shall b...

Страница 29: ...1 US Environment rating IP IP44 IP55 C 31 EU C 31 US 9 2 Inlet Valve Each monitoring station for clean water is permanently equipped with a 2 way ball valve This allows the inlet to the monitoring sta...

Страница 30: ...very F 48 PROCESS F 48 fitting to G 1 Material Nylon PA PVC F 46 PROCESS F 48 PROCESS 9 4 Flow Detector To monitor the minimum flow rate a digital flow detector is installed after the inlet in the mic...

Страница 31: ...at the same time protect the sensors from excessive pressure a flow restrictor is installed in the station after the optical mea surement spectrometer probe or i scan Name Specification Remark Part no...

Страница 32: ...cess connection 1 4 G external thread 9 8 Water Pump Optionally the station can be equipped with a feed pump to ensure sufficient flow If the power is supplied via the con cube the power requirement o...

Страница 33: ...sensor 1 piece Dummy plug for flow cell autobrush incl connecting nut je 2 pieces Safety bracket for sensor 2 pieces Mounting holder for flow cell Replacement brush for autobrush spectromer probe 2 pi...

Страница 34: ...L xx F 508 PANEL per part Required space min 210 mm min 8 27 inch Installation depth Mounting 4 mounting holes 9 mm per panel Material PE HD white PP grey F xxx ECO F 506 PANEL xx F 508 PANEL Material...

Страница 35: ......

Страница 36: ...s can GmbH Brigittagasse 22 24 1200 Vienna Austria Tel 43 0 1 219 73 93 0 Fax 43 0 1 219 73 93 12 office s can at www s can at...

Отзывы: