manualshive.com logo in svg
background image

16552       

STOP!

STOP!

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-844-9273

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Содержание Yardline AUBURN GABLE

Страница 1: ...embly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Sa...

Страница 2: ...This page intentionally left blank...

Страница 3: ...must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 7 CHECK ALL PARTS Inventory all parts listed on pages 4 6 Contact our Customer Service...

Страница 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Страница 5: ...elow is a list of additional materials not included x2 x8 2 x 4 x 8 5 x 10 x 244 cm Treated Lumber Cut to 2 2 x 4 x 93 5 x 10 x 236 cm ea 3 7 6 cm Hot Dipped Galvanized Nails Optional 12 30 5 cm spaci...

Страница 6: ...3 4 x 73 7 8 1 x 4 4 x 187 6 cm x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 3 4 1 9 cm 3 8 x 3 1 4 x 5 7 8 1 x 8 3 x 14 9 cm SHIM x2 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1...

Страница 7: ...x 243 8 cm x2 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 7 16 x 23 7 8 x 44 1 4 1 1 x 121 9 x 112 4 cm x2 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x5 x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 x 3 x10 1 8 5...

Страница 8: ...6 cm 3 4 1 9 cm 2 5 0 cm 1 1 2 3 8 cm x2 Transom window 1 2 5 cm 1 2 1 3 cm 1 1 4 3 2 cm x1 x1 x6 8 x 16 20 3 x 35 6 cm Wall Vent x1 48 Metal Threshold 3 4 1 9 cm x11 Bagged seperately special coatin...

Страница 9: ...ONCRETE Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles 8 Block 4 Block Gravel Gravel Do not exceed 1...

Страница 10: ...ing approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2x4 x 7 5 5 1 x 10 2 x 226 c...

Страница 11: ...er nailing stand on frame 1 Orient parts as shown on flat surface Measure and mark Use two 3 nails at each mark Fig A You have finished your floor frame Proceed to level and square frame BEGIN FINISH...

Страница 12: ...asurements are the same the frame is square The diagonal measurement will be approximately 135 3 4 344 8 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fas...

Страница 13: ...ck the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 135 3 4 344 8 cm Fig C P...

Страница 14: ...oor panels Continue installing 2nd panel using 2 nails 6 apart on edges and 12 apart inside panels 5 x1 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm x62 2 5 1 cm FLOOR PANELS 96 243 8 cm Flush 6 15 2 cm 12 30...

Страница 15: ...L Check the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedur...

Страница 16: ...3 screws Measure over 96 3 4 and install a second CLA flush to the floor deck CLA will overhang the floor Secure using two 3 screws 96 3 4 245 7 cm IMPORTANT MEASUREMENT Fig B Fig A It is very importa...

Страница 17: ...afters over and attach a second gusset using glue and 12 2 nails No need to use jig for this gusset 3 2 Keep CNA firm against outside CLA as shown Fig A Rafters should touch at tips Fig A Apply glue t...

Страница 18: ...1 9 cm GAP CNA x2 CNA x2 Fig A Fig B Fig C Glue where gusset installs Keep rafters firmly against CLA at both ends when securing gusset You have finished assembling your rafters Remove CLA s from flo...

Страница 19: ...B on top of TCA Glue both sides of OSB Nail using 3 nails in the pattern shown Place another TCA on top of OSB 2 3 1 BEGIN You have assembled your door header FINISH 1 OSB TCA TCA Flip header assembly...

Страница 20: ...T For easier nailing stand on frame 2 x 4 x 89 5 x 10 2 x 226 1 cm x1 SZ 3 7 6 cm PARTS REQUIRED x56 FRONT WALL BEGIN 1 Use two 3 nails at each mark Orient parts on edge on floor Measure and mark 89 2...

Страница 21: ...frame flush to top of SZ as shown primed side up There will be a 3 1 2 overlap on either end of the wall Secure panel with 2 nails 6 15 2 cm apart Maintain a 48 opening with OO as a temporary brace as...

Страница 22: ...EQUIRED Center on marks TP TP TM x5 48 122 cm 24 61 cm 72 182 9 cm 96 243 8 cm 75 190 5 cm 72 182 9 cm 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards IMPORTANT You will buil...

Страница 23: ...long right side Maintain 3 4 measurement along edge Secure panel to frame using 2 5 1 cm nails 6 15 2 cm apart along edges For squareness maintain flush at top and along panel edge 6 15 2 cm 3 4 1 9 c...

Страница 24: ...primed side facing up flush with first panel Nail using 2 nails 6 apart on edges and 12 apart inside panel 3 To draw panels tight at seams angle nail Carefully flip your sidewall over Repeat STEPS 1 3...

Страница 25: ...m 20 1 2 52 1 cm 20 1 2 52 1 cm PARTS REQUIRED x2 2 x 4 x 89 5 x 10 2 x 226 1 cm SZ x5 2 x 4 x 72 5 x 10 2 x 182 9 cm TM x20 3 7 6 cm 23 GABLE END WALL TM x5 SZ SZ 3 7 6 cm Nails HINT For easier naili...

Страница 26: ...A Primed side up 48 x 76 121 9 x 193 cm x1 3 4 GAUGE BLOCK BEGIN HERE For squareness maintain flush and 3 4 measurement along panel edges Flush 2 Secure panel to frame using 2 5 1 cm nails 6 15 2 cm a...

Страница 27: ...L Secure using 2 5 1 cm nails 6 15 2 cm apart on edges and 12 30 5 cm apart on inside of panel Place right panel flush to left panel with primed side up x48 2 5 1 cm 3 You have finished building your...

Страница 28: ...to floor frame using 2 nails 6 apart Angle nail to hit floor frame Fig A 2 Nail side wall bottom plate to floor using eight 3 nails 3 FINISH 96 243 8 cm 3 7 6 cm Screws 6 15 2 cm Nail 2 nails first An...

Страница 29: ...all FINISH Secure rear wall to floor using 3 nails Fig C Nail rear wall panel to side wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 15 2 cm Flush Fig A 2 5 1 cm Nails Fig B 2 5 1 cm Nail Angle nail...

Страница 30: ...the rear wall FINISH Secure side wall to floor using 3 nails Fig D Nail back wall panel to side wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 15 2 cm Fig A Fig B Fig C 2 5 1 cm Nail Angle nail to h...

Страница 31: ...3 8 cm PARTS REQUIRED 3 7 6 cm x6 2 5 1 cm x4 BEGIN Remove Temporary Supports and stand gable door wall on floor Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fig A 2 5 1 cm Screw Flush Flush Flush...

Страница 32: ...o eave wall studs using 1 1 2 nails 6 apart Fig E 2 5 1 cm Nails Angle nail to hit floor frame Fig F FINISH 4 3 5 3 7 6 cm Screw 1 1 2 3 8 cm Nails Fig E Secure gable door wall top frame 2 x 4 using 3...

Страница 33: ...S 1 5 8 4 1 cm Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with two 1 5 8 screws as shown OO GAA OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bo...

Страница 34: ...mporary supports and check doors open properly 3 Screw hinge boards into wall supports and floor using ten 3 screws as shown 3 7 6 cm Screws Fig B 3 8 1 cm Attach temporary support OO as a ledger boar...

Страница 35: ...ld between doors and secure using eight 3 4 special coating screws into floor as shown Fig C 7 4 Secure horizontal door rails BEA with three 3 4 screws per each rail from behind to center of doors as...

Страница 36: ...r rated caulk From back side of door position window in opening and ensure square with door edge Use four screws to secure each window 9 8 Apply high quality exterior grade caulk on the backside of do...

Страница 37: ...2 screws through outside trim into OO Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH Center OO vertically on the right door in the door opening offset 3 4 1 6 cm with the edge of door Fig...

Страница 38: ...d mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 3 4 1 9 cm x12 You have finished installing your decorative hinges and have prepared your door for door ha...

Страница 39: ...UIRED Backplate x1 1 1 4 x2 Handle locking with Screws x1 1 1 4 x8 3 Point Door Locking Mechanism RIGHT DOOR Set Screw 1 1 4 Wood Screw 1 1 4 Pan Head Screw Secure backplate with 1 screws and handle w...

Страница 40: ...ations of brackets and plates Washer Washer UPPER BRACKET with offset Orient bracket as shown Washer Washer Plate 1 1 4 Pan Head Screw Orient bracket as shown LOWER BRACKET with offset Plate 1 1 4 Pan...

Страница 41: ...39 45o DOOR HARDWARE 2 1 4 2 1 4 TOP of Door RIGHT DOOR LEFT DOOR Make sure rods are straight up and down when locating brackets BOTTOM of Door Weatherstrip IMPORTANT This rod to edge of weatherstrip...

Страница 42: ...40 DOOR HARDWARE Align Plates with vertical rod points Drill thru with 3 8 drill bit to 2 depth into header and floor FRAMING PLATE FLOOR VERTICAL RODS PLATE Drill with 3 8 bit to 2 depth...

Страница 43: ...ssembled Rafter with 1 Gusset FINISH You have finished attaching your Rafters BEGIN 1 Secure rafters to top plate with two 3 screws above notch as shown in Fig A B Note the One Gusset Rafters at each...

Страница 44: ...el FRONT GABLE PANEL PARTS REQUIRED x1 x1 Primed side up Primed side up Flush 1 3 4 4 5 cm 1 1 2 3 8 cm 1 1 2 3 8 cm Nails UY on flat CQA on flat Orient parts on flat as shown Place LEFT front gable p...

Страница 45: ...LE PANEL PARTS REQUIRED x1 x1 Primed side up Primed side up 1 3 4 4 5 cm 1 1 2 3 8 cm 1 1 2 3 8 cm Nails SBA on flat Orient parts on flat as shown Place LEFT front gable panel as shown and secure usin...

Страница 46: ...BEFORE NAILING 2 Continue nailing lower edge of panels into top plate using 2 nails 6 apart as shown in Fig A You have finished attaching your gable units FINISH 2 5 1 cm x76 Fig B TOP PLATE CQA 3 7...

Страница 47: ...n top Secure using 3 screws as shown Fig A Ensure parts are flush along edges 2 3 4 1 BEGIN You will build two assemblies Fig B x4 2 x 4 x 61 7 8 5 1 x 10 2 x 157 2 cm CMA x8 2 x 4 x 4 7 8 5 1 x 10 2...

Страница 48: ...9 x 33 3 cm Left Ladder Frame Right Ladder Frame 7 16 x 9 x 48 1 3 x 22 9 x 243 8 cm 7 16 x 9 x 13 7 8 7 16 x 9 x 48 Flush You have finished building your gable assemblies Place each ladder assembly w...

Страница 49: ...1 cm nails 3 7 6 cm x14 Flush Flush Secure the overhang onto the rafter using 2 5 1 cm nails spaced six inches apart Fig C Secure using 3 7 6 cm screws through the underside of the ladder assembly thr...

Страница 50: ...ll roof panels need to be installed with the rough side up painted grid lines 7 16 x 13 7 8 x 96 1 1 x 35 2 x 243 8 cm x1 Flush Attach a 13 7 8 x 96 roof panel flush to installed lower panel and flush...

Страница 51: ...2 nails 6 apart on edges and 12 apart inside panel You have finished installing your roof panels Repeat STEPS 1 4 to attach roof panels on the opposite side 5 PARTS REQUIRED ROOF PANELS FINISH 6 15 2...

Страница 52: ...C gable end and right overhang board Fig D Secure using twelve 2 finish nails Ensure soffit boards are flush at seam Fig B and flush at peak Fig D x2 3 8 x 7 7 8 x 59 15 16 1 x 20 x 152 2 cm x24 2 5 1...

Страница 53: ...ffit boards on the opposite side Toenail at center seam Fig C Ensure soffit boards are flush at rafter ends Fig B and flush at seams x2 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x2 3 8 x 5 7 8 x 24 3 4...

Страница 54: ...wn Secure using 2 finish nails into rafter ends Fig A B Repeat Step 1 on opposite eave You have finished installing your eave side fascia FINISH 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 80 5 8 1 x 12 1...

Страница 55: ...spaced evenly as shown Repeat Step 2 to attach fascia boards on the front side Front side is without 3 1 4 x 5 7 8 shims 3 You have finished installing your back gable fascia FINISH 1 BEGIN Hint Pre...

Страница 56: ...op as shown Repeat Steps 1 2 to attach trim to all four corners Finish attaching trim flush to corners Fig A using six 2 5 1 cm finish nails as shown You have attached your corner trim 3 2 73 7 8 187...

Страница 57: ...left side Secure shelf supports at shown height with three 2 5 1 cm nails 1 BEGIN 2 x30 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x5 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x5 PARTS REQUIRED AE x4 x1...

Страница 58: ...ch support Secure KP with two 2 5 1 cm nails at each support as shown 3 FINISH You have finished installing your shelves 4 x10 x10 1 1 4 3 2 cm 2 5 1 cm 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 1 x...

Страница 59: ...RITY 3 7 6 cm Nails TP x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x11 3 7 6 cm x28 2 5 1 cm x2 7 16 x 23 7 8 x 44 1 4 1 1 x 112 4 x 104 cm Flush Attention Load not to exceed 400 lbs 181 kg evenly distribu...

Страница 60: ...d level collar tie on third rafter from front HINT For best appearance install collar tie on rafter facing away from door opening Attach with 2 nails as shown You have finished installing your collar...

Страница 61: ...IRED FINISH BEGIN 1 Locate vent in the front gable wall as shown You have finished installing your vent Secure using 1 2 5 cm screws x1 GABLE VENT 15021 x4 8 x 1 2 5 cm Pan Head Screws 8 x 1 2 5 cm Pa...

Страница 62: ...st if you have a gable vent Measure and mark vent hole in wall as shown Cut out marked opening Caulk behind vent flanges Secure using 1 2 1 3 cm screws You have finished installing your wall vent 3 5...

Страница 63: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 64: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Страница 65: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Страница 66: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 67: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 68: ...between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 69: ...aint and seal all exposed edges sides and faces of siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necess...

Отзывы: