
45
FRONT GABLE LADDERS
PARTS REQUIRED:
Fig. C
61-3/4"
(156,8 cm)
3-1/2"
(8,9 cm)
35-3/8"
(89,9 cm)
13-7/8"
(33,3 cm)
3"
(7,6 cm)
Screws
3"
(7,6 cm)
Screws
CMA
CMA
CLA x4
Arrange, measure and mark locations of four
CLA
as shown place
CMA
on top. Secure using 3" screws as shown
(Fig. A)
. Ensure parts are
flush along edges.
2
3
4
1
BEGIN
You will build
two
assemblies
(Fig. B)
.
x4
2 x 4 x 61-7/8" (5,1 x 10,2 x 157,2 cm)
CMA
x8
2 x 4 x 4-7/8" (5,1 x 10,2 x 12,4 cm)
CLA
3" (7,6 cm)
x32
Fig. B
x2
Fig. A
Flush
Flush
Flush
Flip over gable ladder sub-assembly and attach
CMA
to four
CLA
using 3" screws
(Fig. C)
.
Repeat
Steps 1-4
to build one additional gable ladder sub-assembly Frame.
Содержание Yardline AUBURN GABLE
Страница 2: ...This page intentionally left blank...