82
Flush at
SEAM
PARTS REQUIRED:
LOFT
x1
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x14
3" (7,6 cm)
2 x 4 x 24" (5,1 x 10,2 x 61 cm)
RL
x1
2 x 4 x 119-7/8" (5,1 x 10,2 x 304,5 cm)
x1
Pre-Assembled Loft Joist
Locate TP and
RL
flush to bottom of top plate and aligned at seam. Secure with 3" (7,6 cm) nails at wall
studs and seam.
5
7/16" (11 mm) Drill Bit
x2
x4
x2
3/8" x5-1/2" (1 cm x 14 cm)
3/8" (1 cm)
3/8" (1 cm)
Hex Bolt
Flat Washer
Lock Nut
(NOT ACTUAL SIZE)
6
7
Clamp or hold
Pre-Assembled Loft Joist
in place flush against window crippler and back wall stud.
Ensure
Pre-Assembled Loft Joist
is flush beneath top plates.
Drill through wall stud with 7/16" drill bit using hole in
Pre-Assembled Loft Joist
as a guide.
Line up holes of
Pre-Assembled Loft Joist
with holes in crippler and stud.
Secure joist with hex bolts, flat washers and lock nuts at both sides
(Fig. B)
.
Tighten lock nuts securely.
GABLE
WALL
3" (7,6 cm)
Nails
TP
RL
Flush
Flush
Fig. B
Flush
Flush
JOIST TO FRONT OF
WINDOW CRIPPLER
JOIST TO FRONT OF STUD
Содержание Yardline 16549
Страница 2: ...This page intentionally left blank...