background image

KKA

x1

2 x 6 x 81" (5,1 x 15,2 x 205,7 cm)

62

HINT:

 Use 

KNA

 as a support.

PARTS REQUIRED:

DORMER ROOF UNIT

7/16 x 35-7/8 x 67-5/8"
(1,1 x 91,1 x 171,8 cm)

x2

1-5/8" (4,1 cm)

x14

KNA

x2

2 x 4 x 52-1/2" (5,1 x 10,2 x 133,3 cm)

TEMPORARY SUPPORT

1

BEGIN

Place 

KKA

 on floor or other flat surface. Measure and mark KKA at center point 

(Fig. A)

.

You have finished assembling your dormer roof unit.

FINISH

5

2

3

4

Place 

35-7/8" x 67-7/8" 

roof panel on top of 

KKA

 with the rough side up. Ensure panel is on center mark and 

flush along front edge. 

Attach 

35-7/8" x 67-7/8" 

roof panel using (6) 1-5/8" screws in a staggered pattern.

Place second 

35-7/8" x 67-7/8" 

roof panel on top of 

KKA

 as shown with the rough side up. Ensure panel is flush 

at seam and along front edge. Attach 

35-7/8" x 67-7/8" 

roof panel using (6) 1-5/8" screws in a staggered pattern. 

Attach 

GAA

 as a temporary panel stabilizer using 1-5/8" screws as shown.

Fig. A

KKA

Flush

Flush

Flush

1-5/8" (4,1 cm) Screws

-Staggered Pattern-

1-5/8" (4,1 cm) Screws

40-1/2"

(102,9 cm)

40-1/2"

(102,9 cm)

KNA

TEMPORARY SUPPORT

GAA

TEMPORARY STABILIZER

Содержание Yardline 16549

Страница 1: ...or product information call our toll free number 1 800 844 9273 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM...

Страница 2: ...This page intentionally left blank...

Страница 3: ...red drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed...

Страница 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Страница 5: ...hown below as shaded Below is a list of additional materials not included x3 x12 2 x 4 x 10 5 x 10 x 304 8 cm Treated Lumber Cut to 3 2 x 4 x 117 5 x 10 x 297 2 cm ea 3 7 6 cm Hot Dipped Galvanized Na...

Страница 6: ...S x3 2 x 4 x 8 5 1 x 10 2 x 20 3 cm COA x3 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 3 4 1 9 cm 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1 GAA DOOR OO x2 1 1 2 x 2 1 2 x 69 3 8...

Страница 7: ...OR x2 x2 x2 3 8 x 35 1 8 x 84 1 x 89 2 x 213 4 cm x1 3 8 x 35 1 8 x 84 1 x 89 2 x 213 4 cm x1 x2 3 8 x 23 7 8 x 84 1 x 60 6 x 213 4 cm x7 3 8 x 48 x 84 1 x 121 9 x 213 4 cm 3 8 x 36 3 4 x 84 1 x 93 3...

Страница 8: ...19 32 x 3 1 2 x 58 5 8 1 5 x 8 9 x 148 9 cm 6 NOTE Panel parts are not stamped Roof panels are 7 16 1 1 cm thick ROOF PANELS 7 16 x 7 11 16 x 24 1 1 x19 5 x 61 cm x1 7 16 x 27 1 4 x 48 1 1 x 69 2 x 12...

Страница 9: ...23 7 8 1 1 x 20 0 x 60 6 cm x1 7 16 x 7 7 8 x 96 1 1 x 20 0 x 243 8 cm x1 1 x 4 x 23 7 8 2 5 x 10 2 x 60 6 cm JS x2 7 16 x 35 7 8 x 67 5 8 1 1 x 91 1 x 171 8 cm x1 7 16 x 4 1 2 x 64 1 2 1 1 x 11 4 x 1...

Страница 10: ...m 3 7 6 cm 3 4 1 9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm 1 1 2 3 8 cm x2 1 2 5 cm 3 4 1 9 cm x8 9 x 27 22 8 x 68 5 cm x16 1 2 5 cm x4 x1 1 1 4 x2 1 1 4 x2 Handle locking with Screws x2 x4 x2 3 8 x5 1 2 1 cm x...

Страница 11: ...or best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUI...

Страница 12: ...all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete sla...

Страница 13: ...7 5 1 x 10 2 x 297 2 cm PARTS REQUIRED Center on marks FLOOR FRAME Flush Flush HINT For easier nailing stand on frame 2 1 Use two 3 nails at each mark Orient parts as shown on flat surface Measure and...

Страница 14: ...ment will be approximately 187 7 16 476 1 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the fr...

Страница 15: ...or frame is square by installing one panel and squaring frame Fig C Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame i...

Страница 16: ...inside panels 5 7 6 x1 x2 5 8 x 48 x 96 1 6 x 122 x 243 8 cm 5 8 x 47 7 8 x 48 1 6 x 121 9 x 122 cm x1 5 8 x 23 7 8 x 96 1 6 x 60 6 x 243 8 cm x1 5 8 x 23 7 8 x 48 1 6 x 60 6 x 122 cm x124 2 5 1 cm FL...

Страница 17: ...he floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during...

Страница 18: ...k this PVA is 36 at both ends for squareness BEGIN 1 Secure one PVA flush to the floor deck using two 3 screws Measure over 120 3 4 and install a second PVA flush to the floor deck PVA will overhang t...

Страница 19: ...sset using glue and 12 2 nails No need to use jig for this gusset 4 3 2 Keep ECN firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should touch at tips Fig A A...

Страница 20: ...one more single gusset rafter Remove PVA s from floor 7 8 6 5 Keep ECN firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should touch at tips Fig A Apply glue...

Страница 21: ...rews Check this PVA is 36 at both ends for squareness BEGIN 1 Secure one PVA flush to the floor deck using two 3 screws Measure over 120 3 8 and install a second PVA flush to the floor deck PVA will o...

Страница 22: ...second gusset using glue and 12 2 nails No need to use jig for this gusset 4 5 6 3 2 Keep KGA and ECN firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should...

Страница 23: ...nd ECN firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should touch at tips Fig A Apply glue to rafters where gusset will attach Fig B Place gusset onto KGA...

Страница 24: ...rn shown Fig C No need to use jig for this gusset 11 9 8 7 Keep KGA and ECN firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should touch at tips Fig A Place...

Страница 25: ...ttern 2 BEGIN 1 Apply wood glue to both sides of 3 1 2 x 59 Filler Nail together using 3 nails in a staggered pattern Fig A You have finished assembling your door header FINISH 3 x2 2 x 4 x 59 5 1 x 1...

Страница 26: ...cm x12 x2 2 x 4 x 24 1 2 5 1 x 10 2 x 62 2 cm KHA x4 2 x 4 x 21 3 8 5 1 x 10 2 x 54 3 cm KJA x4 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK BEGIN 1 Use two 3 nails at each mark Repeat Steps 1 2 to build seco...

Страница 27: ...1 x 10 2 x 122 cm SP x2 2 x 4 x 44 5 1 x 10 2 x 111 8 cm ST BEGIN 1 Use two 3 nails at each mark Orient parts on edge on floor Measure and mark 2 44 111 8 cm 44 111 8 cm 56 142 2 cm 80 203 2 cm 68 1 2...

Страница 28: ...sembly HINT For easier nailing stand on frame 3 Place Window Frame Assembies as shown Measure and mark Secure with 3 nails 131 5 8 334 3 cm 131 5 8 334 3 cm 35 1 4 89 5 cm 35 1 4 89 5 cm 12 3 8 31 4 c...

Страница 29: ...ient parts as shown Measure and mark Secure with 3 nails Before installing KIA on left side pre drill a 7 16 hole Fig A This part will be used when assembling your loft Do not nail through hole You ha...

Страница 30: ...ame with primed side up as shown Secure panel with 2 nails 6 apart Repeat Step 1 to attach the right 36 3 4 panel 2 BEGIN 1 Maintain Flush Maintain Flush Primed side up Primed side up Flush 6 15 2 cm...

Страница 31: ...panels as shown Secure panel with 2 nails 6 apart apart on edges and 12 apart inside panel Repeat Step 3 to attach the right 35 1 8 x 84 panel 4 3 You have finished building your front wall FINISH 6...

Страница 32: ...m 48 121 9 cm 96 243 8 cm 96 243 8 cm TK x7 SP TP TP SP HINT For easier nailing stand on frame x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x7 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 48 5 1 x 10 2 x...

Страница 33: ...with primed side up as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with two 2 nails in the corners Fig A Nail the panel using 2 nails 6 apart on edges and 12 ap...

Страница 34: ...n with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 6 Place end 48 x 84 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges an...

Страница 35: ...3 7 6 cm Nails 44 1 2 113 cm 44 1 2 113 cm 92 1 2 235 cm 68 1 2 174 cm 68 1 2 174 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2 3 8 cm 113 287 cm 113 287 cm x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 2 x 4...

Страница 36: ...rame flush at top and with a 3 4 gap on right side Maintain 3 4 measurement along edge x52 2 5 1 cm 34 GABLE END WALLS 12 30 5 cm 3 1 2 8 9 cm 3 4 GAUGE BLOCK GAA 48 x 84 122 x 213 4 cm x1 3 4 GAUGE B...

Страница 37: ...lush Flush For squareness maintain flush along panel edges 48 122 cm 23 7 8 60 6 cm 12 30 5 cm 6 15 2 cm Flush Place 23 7 8 x 84 primed side up and flush with installed 48 x 84 panel edge Ensure panel...

Страница 38: ...to floor using 3 nails Fig A 4 3 7 6 cm x12 x2 x25 BACK WALL INSTALLATION 3 7 6 cm Screws OO 3 Nails into bottom plate 3 7 6 cm Screw BEGIN Stand right sidewall on floor Center right back wall assembl...

Страница 39: ...standing your gable end wall FINISH 7 Secure gable wall to floor using 3 nails Fig C Nail gable wall panel to back wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 6 15 2 cm Flush Fig A Fig B 2 5 1 cm...

Страница 40: ...able wall panel to front wall stud using 1 1 2 nails 6 apart Fig B 5 6 3 ENSURE GABLE AND FRONT WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Fig B 1 1 2 3 8 cm Nails Fig C BE SURE TOP OF WALL FRAME...

Страница 41: ...floor frame Fig D 7 Secure front wall bottom plates to floor using 3 nails Fig D Remove temporary braces 8 9 3 7 6 cm x10 2 5 1 cm x16 FRONT WALL INSTALLATION 3 7 6 cm Nails Nail 2 nails first 2 5 1 c...

Страница 42: ...x6 2 5 1 cm x4 BEGIN Remove Temporary Supports and stand gable end wall on floor It is important to secure the gable end wall in the following order Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fi...

Страница 43: ...to front and back wall studs using 1 1 2 nails 6 apart Fig E 2 5 1 cm Nails Angle nail to hit floor frame FINISH 7 4 3 5 6 1 1 2 3 8 cm Nails Fig F 3 7 6 cm Screw Fig E Secure gable wall top frame 2...

Страница 44: ...d secure using 1 1 2 nails 2 1 BEGIN 3 4 5 Place second RL as shown Place MIDDLE front gable panel flush to installed left panel Ensure panels are flush Secure panel to installed RL using 1 1 2 nails...

Страница 45: ...t parts as shown Fig A You will build FOUR assemblies Fig B x8 2 x 3 x 75 1 4 5 1 x 7 6 x 191 1 cm ECA x16 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x64 Fig B x4 Fig A Flush Flush Flush Flush Fl...

Страница 46: ...assemblies as shown Fig E You will build TWO complete assemblies 3 7 6 cm x8 Fig E Fig F x2 Gable Assemblies Flush Flush Flush Flush 3 7 6 cm Screws Attach PVA to ladder assembly using 3 screws Fig F...

Страница 47: ...ttach back gable unit On the inside secure gable with two 3 screws toe screwed into RL at an angle as shown in Fig B Fig B TOP PLATE Stand gable unit on gable wall top plate Measure 1 1 2 down from to...

Страница 48: ...panel Ensure rafter notch is tight to side wall Fig A Fig B Rest second truss on top plate aligned over stud and at 36 3 8 measurement from inside of gable panel Ensure rafter notch is tight to gable...

Страница 49: ...2 x 4 x 71 1 8 5 1 x 10 2 x 180 7 cm KGA x2 2 x 4 x 72 5 1 x 10 2 x 180 7 cm TM Use two 3 nails at each mark Orient parts on edge on floor Measure and mark Orient KDA and TM overhang parts on edge on...

Страница 50: ...t top plate Fig B and resting on wall Ensure dormer wall frame is flush to front edges of installed dormer panels Fig C 2 3 4 5 x18 1 1 2 3 8 cm x2 7 16 x 20 3 16 x 61 1 4 1 1 x 51 3 x 155 6 cm F l u...

Страница 51: ...eak of installed truss Fig F Fig G Place 20 x 72 OSB panel against front wall frame and resting on top of door panels Ensure front dormer panel is flush with side panels along edge Fig E 9 7 10 8 6 x1...

Страница 52: ...er notch is tight to side wall Fig D Fig G Rest middle truss on dormer frame and back wall top plate Align truss over back wall stud and at 37 1 2 measurement from outside of rafter Ensure truss notch...

Страница 53: ...pre assembled overhang unit between truss ends as shown Ensure overhang unit is flush with ends Secure with 3 screws HINT Use a C clamp at each side to hold frame flush and square with trusses during...

Страница 54: ...to side until the outside long edge is flush with the outer gable frame Fig B Secure with two 2 nails You may need to move your truss and gable frame unit to make panel flush with outer gable frame Fi...

Страница 55: ...side up Use a gauge block to ensure the panel measures 3 4 1 9 cm along the length of the rafter Fig C Panel should be flush with end of rafter Fig B and flush along edge of installed panel Move and...

Страница 56: ...re the panel measures 3 4 1 9 cm along the length of the rafter Fig A Secure the lower edge of roof panel using two 2 nails in corners as shown Move up to the top of the 48 x 96 panel and keep spacing...

Страница 57: ...NISH 11 6 15 2 cm 12 30 5 cm 7 16 x 27 1 4 x 32 5 8 1 1 x 69 2 x 82 9 cm x2 10 Place the 27 1 4 x 32 5 8 roof panels as shown with the rough side up Panels should be flush along edge of installed pane...

Страница 58: ...h with end of rafter Fig A and gable outer frame as shown Secure with 2 nails 6 apart on edges and 12 apart inside panel Place a 27 1 4 x 44 5 8 roof panel as shown with the rough side up Ensure panel...

Страница 59: ...24 1 1 x19 5 x 61 cm x1 Place 7 7 8 x 24 and 7 7 8 x 48 roof panels as shown with the rough side up Ensure panels are flush with edge of installed panels as shown Secure with 2 nails 6 apart 5 You hav...

Страница 60: ...es Secure felt with 1 roofing nails as shown Nail only into dormer OSB panels with framing behind panel Trim felt around OSB window openings Flash the front of dormer using 3 4 x 32 flash cards Overla...

Страница 61: ...with 1 nails Do not nail into dormer wall Lay next shingle on top of 5 x 7 flashing Secure shingle with 1 nails Bend and place next 5 x 7 flashing up the dormer wall and on top of shingle Overlap fla...

Страница 62: ...ce right side 16 11 16 x 58 panel flush along top of OSB side panel Ensure 16 11 16 x 58 side panel is flush with front edge of 16 3 4 x 72 front panel Fig C Secure with 8 2 nails into through side OS...

Страница 63: ...inside of shed secure bottom of 16 11 16 x 58 outer side panel with 3 4 screws through side OSB panel HINT Have someone from outside dormer press in on bottom of outer side panel Fig D Set 5 3 4 screw...

Страница 64: ...top of KKA with the rough side up Ensure panel is on center mark and flush along front edge Attach 35 7 8 x 67 7 8 roof panel using 6 1 5 8 screws in a staggered pattern Place second 35 7 8 x 67 7 8...

Страница 65: ...REQUIRED DORMER SIDE SOFFIT ASSEMBLIES 2 5 1 cm x12 YOU WILL BUILD A LEFT AND A RIGHT SOFFIT ASSEMBLY You have finished assembling your dormer roof side assemblies FINISH 4 2 3 Repeat Steps 1 2 for op...

Страница 66: ...tends past dormer panel by 4 1 8 at both sides Fig A and is tight against front dormer panel Mark truss locations on DORMER ROOF UNIT and secure with 2 nails 6 apart along panel edges and 12 apart in...

Страница 67: ...and flush with front soffit board KKA 5 6 7 Secure soffit unit with 2 nails Fig C Toe screw soffits together with 3 screws Fig B Repeat Steps 4 6 for other soffit unit 2 5 1 cm Nails x1 Pre assembled...

Страница 68: ...1 2 x 64 1 2 dormer roof panels on either side of installed dormer roof panels Hold flush to front and along panel seam Secure with 1 5 8 screws in a staggered pattern as shown 7 16 x 4 1 2 x 64 1 2 1...

Страница 69: ...our dormer fascia trim FINISH 6 2 5 4 3 Secure with 2 finish nails Secure with 2 finish nails Place MGA flush with roof panels and flush with MHR and MHL Fig A Repeat Steps 1 2 for MHL 1 BEGIN Place M...

Страница 70: ...with 2 finish nails BEGIN 1 x4 3 4 Screws per window You must caulk around windows to validate warranty Seal windows with high quality exterior grade caulk before installing HINT Caulk behind frame n...

Страница 71: ...Hold in place and secure with 2 finish nails Place EY square and flush up to MJA Secure with 2 finish nails Place second EY square and flush up to MJA Secure with 2 finish nails Place MJA flush up to...

Страница 72: ...rd Fig D Secure using twelve 2 finish nails Repeat Steps 1 2 to attach soffit boards on the opposite side Ensure soffit boards are flush at seam Fig B and flush at peak Fig D x4 3 8 x 7 7 8 x 73 5 16...

Страница 73: ...ls two in each rafter Repeat Step 1 to attach eave side soffit boards on the opposite side Ensure soffit boards are flush at rafter ends Fig B and flush at seams x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184...

Страница 74: ...s 1 2 to attach fascia boards on the other gable end 3 You have finished installing your gable fascia FINISH 4 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7...

Страница 75: ...wn Fig A Secure using 2 finish nails into rafter ends Repeat Step 1 on opposite eave You have finished installing your eave side fascia FINISH 3 1 BEGIN PARTS REQUIRED x4 3 8 x 4 3 4 x 80 5 8 1 x 12 1...

Страница 76: ...IRED x1 Left Door x1 Right Door BEGIN 1 DOORS x1 1 1 4 3 2 cm x2 2 3 HINT Look for 3 8 SPACER attached to doors GAA OO Make sure spacer is attached Tighten screws securely OFFSET 4 3 7 6 cm Screws Scr...

Страница 77: ...Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using 3 screws Fig A Screw hinge boards into wall frame and floor using ten 3 screws as shown Make sure screw...

Страница 78: ...GI 9 22 9 cm 9 22 9 cm BEGIN 1 2 Secure two horizontal door rails GI with four 3 4 screws from behind to center of doors as shown Secure door trim from inside using 3 4 screws as shown Fig A 4 Center...

Страница 79: ...OR WEATHERSTRIP OO FINISH 5 On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO using five 3 screws through outside trim in...

Страница 80: ...s open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B PARTS REQUIRED DOOR x2 x8 5 16 0 8 cm Drill Bit You have finished in...

Страница 81: ...Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 You have finished preparing your door for door handle FINISH 6 Install decorative hinges on horizontal trim and flush against hinge as shown 5 TOP VIEW 1 2 5 cm 1...

Страница 82: ...Steps 1 2 to attach trim to all four corners Finish attaching trim flush to corners Fig B using six 2 5 1 cm finish nails as shown You have attached your corner trim 3 2 81 7 8 208 cm 81 7 8 208 cm o...

Страница 83: ...e Spread glue across RL and TP as shown Hold parts TP and RL flush and aligned 1 3 4 4 4 cm 1 3 4 4 4 cm x2 Glue RL TP TP Flush Flush Flush 3 7 6 cm Nails x12 RL 2 3 4 Assemble joist with 3 nails in a...

Страница 84: ...t Flat Washer Lock Nut NOT ACTUAL SIZE 6 7 Clamp or hold Pre Assembled Loft Joist in place flush against window crippler and back wall stud Ensure Pre Assembled Loft Joist is flush beneath top plates...

Страница 85: ...o exceed 400 lbs 181 kg evenly distributed across loft FINISH 9 You have finished installing your Loft 8 20 3cm 2 5 1 cm Nails Flush Flush 8 Install loft panel centered over loft joists Secure with 2...

Страница 86: ...t with three 2 5 1 cm nails 1 BEGIN 2 x36 2 5 1 cm 3 8 x 7 1 2 x 10 1 8 1 x 19 1 x 25 7 cm x6 2 x 3 x 6 5 8 5 1 x 7 6 x 16 8 cm PHA x6 PARTS REQUIRED PHA x5 x1 2 5 1 cm Nail Flush Flush Flush 33 1 2 8...

Страница 87: ...ils at each support as shown 3 FINISH 5 You have finished installing your shelves 4 x28 2 5 1 cm 7 16 x 7 7 8 x 23 7 8 1 1 x 20 x 60 6 cm x1 7 16 x 7 7 8 x 96 1 1 x 20 x 243 8 cm x1 1 x 4 x 23 7 8 2 5...

Страница 88: ...LR to bracket panels using three 2 5 1 cm nails Assemble 6 shelf supports as shown 5 right side 1 left side 1 Secure work bench supports at shown height with three 2 5 1 cm nails 2 PARTS REQUIRED LR...

Страница 89: ...S x1 1 x 4 x 96 2 5 x 10 2 x 243 8 cm KP x1 Install work bench panels centered over bench supports Secure with 2 5 1 cm nails at each support Secure KP and JS with 2 5 1 cm nails at each support as sh...

Страница 90: ...d to install your window 2 3 Attach slats CY using 1 screws Allow 1 4 gap between CY Repeat Steps 1 2 to assemble another pair of shutters CY x3 CY x3 Flush Flush 1 4 3 8 cm GAP 1 4 3 8 cm GAP 2 1 2 6...

Страница 91: ...caulk before installing Fig A 2 3 Attach window using four 1 5 8 4 1 cm screws as shown Ensure window is level Mark center of window frame as shown Window 16 1 4 x 22 1 4 41 3 x 56 5 cm x2 WINDOW 4 R...

Страница 92: ...MDA centered on mark and flush to shutters as shown Attach using 2 finish nails Nail into window frame inside You have finished installing your front windows and shutters Repeat Steps 5 7 to install s...

Страница 93: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 94: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Страница 95: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Страница 96: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 97: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 98: ...between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 99: ...t and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas Timber Buildings To validate your wa...

Отзывы: