6
DRIP EDGE ..................... 60 Feet
#15 ROOFING FELT
To cover 162 sq. ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
IMPORTANT!
Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists
(shown below as shaded). Below is a list of additional materials (not included):
x3
x12
2 x 4 x 10' (5 x 10 x 304,8 cm) Treated Lumber
Cut to (3) 2 x 4 x 117" (5 x 10 x 297,2 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
Optional 12" (30,5 cm) spacing
Standard 16" (40,7 cm) spacing
OPTIONAL MATERIALS
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
COMPLETING YOUR SHED
You will need these additional materials:
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
• This shed does not include any floor or leveling materials. Use our optional floor kit with building instructions and nails included.
• See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your floor,
as this will vary depending on your specific site.
• If you choose to install your kit on a concrete slab refer to page 7.
• If you choose to build your own wood floor foundation refer to page 8.
3-TAB SHINGLES ............................. 6 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................ 3 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM .......................... 2 Quarts
Use 100% acrylic latex exterior paint.
Содержание GABLE 8 x 12
Страница 2: ...This page intentionally left blank...