40
PARTS REQUIRED:
GABLE END SOFFITS
Position right
59-15/16"
overhang board flush to front wall
(Fig A)
and gable panel seam
(Fig B)
.
Secure with (12) 2" finish nails.
Position left
59-15/16"
overhang board flush to front wall gable end
(Fig C)
,
and right overhang board
(Fig. D)
. Secure with (12) 2" finish nails.
Repeat steps to attach soffit boards on the opposite side.
x4
3/8 x 7-7/8 x 59-15/16" (1 x 20 x 152,2 cm)
x48
2" (5,1 cm)
2
1
BEGIN
Your gable soffit panels are now installed.
FINISH
Flush to wall.
Fig. C
Centered and
fush at peak.
Fig. D
8"
(20,3 cm)
Flush to wall.
Fig. A
Fig. B
8"
(20,3 cm)
2" (5,1 cm)
Finish Nails
x12 per side
Flush at
center seam.
Flush
Flush
2" (5,1 cm)
Finish Nails
Install all panels with the primed side facing down.