38
24"
(60,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
24-3/8"
(62,9 cm)
24"
(60,9 cm)
24-3/8"
(62,9 cm)
PARTS REQUIRED:
ROOF PANELS
2" (5,1 cm)
Nails
Place a
13-7/8" x 96"
upper roof
panel flush to lower panel.
Ensure 3/4" measurement on the
rafter
(Fig. A)
.
Secure the panel with 2" nails in
each corner.
Place a
13-7/8" x 48"
upper roof
panel flush to installed panels.
Secure the panel with 2" nails in
each corner.
5
6
13-7/8"x 96"
13-7/8"x 48"
7
Fig. D
Maintain spacing between the center of the rafters for the lower panels
(Fig. D)
.
Secure panels with (1) 2" nail into the rafters, as shown.
Move to the top panels and keep spacing between the center of the rafters.
Secure panels with (1) 2" nail into the rafters.
NOTE:
Measurements from inside of gable panels
7/16 x 13-7/8 x 48"
(1,1 x 35,2 x 121,9 cm)
x1
7/16 x 13-7/8 x 96"
(1,1 x 35,2 x 243,8 cm)
x1
2" (5,1 cm)
x24
3/4" GAUGE
BLOCK
3/4"
(1,9 cm)
Fig. A
13-7/8" x 96"
3/4"
GAUGE
BLOCK
Flush
2" nail
in each
corner
Содержание GABLE 8 x 12
Страница 2: ...This page intentionally left blank...