background image

16

x40

2" (5,1 cm)

PARTS REQUIRED:

Place (1) 

48" x 84"

 panel on the wall frame, as shown. 

Locate the panel 1-1/2" above the top plate.  
Use a 2x4 as a gauge block for the 1-1/2" top overhang measurement.  
Use the 

GAA

 gauge block to mark the 3/4" side measurement on the wall stud. 

Secure panel with (2) 2" nails in the corners 

(Fig. A).

2

Secure panel with 2" nails spaced 6" apart on edges and 12" apart inside panel.

EXAMPLE WALL 

Ensure your wall is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever,  
move the panel side-to-side until you have a 3/4" measurement on the wall stud.  
Secure corner with (2) 2" nails 

(Fig. B)

.

3/4" Gauge 

Block

x1

3/8 x 48 x 84"

(1 x 121,9 x 213,4 cm )

For squareness maintain 1-1/2"  

and 3/4" measurement along panel edges.

BEGIN  HERE

3/4"

(1,9 cm)

6" 

(15,2 cm)

12" 

(30,5 cm)

         2x4 

TEMP. SPACER

3/4" GAUGE 

BLOCK

GAA

WALL PANEL INSTALLATION HINTS & EXAMPLES

BEGIN

1

 Angle nail to draw panels 

 tight at seams.

Install all wall panels with the primed side facing up.

2x4

1-1/2"

(3,8 cm)

3/4"

(1,9 cm)

Fig. A

 3/4" 

(1,9 cm)

2 Nails

1-1/2" 

(3,8 cm)

overlap at top

Fig. B

 3/4" 

(1,9 cm)

1-1/2" 

(3,8 cm)

overlap at top

2 Nails

HINT

Содержание GABLE 8 x 12

Страница 1: ...M AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based...

Страница 2: ...This page intentionally left blank...

Страница 3: ...tact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and...

Страница 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Страница 5: ...stalled RGF x4 3 8 x 1 3 4 x 81 7 8 1 x 4 4 x 208 cm 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1 GAA 3 4 1 9 cm x2 2 x 4 x 4 5 1 x 10 2 x 10 2 cm CQA x12 6 x 24 15 2 x 61 c...

Страница 6: ...x 213 4 cm x2 x2 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x2 7 16 x 48 x 47 7 8 1 1 x 121 9 x 121 6 cm x2 7 16 x 48 x 8 1 2 1 1 x 121 9 x 21 6 cm x2 7 16 x 13 7 8 x 48 1 1 x 35 2 x 121 9 cm x2 7 16 x 13...

Страница 7: ...re screws are shown for quicker assembly Length of nail must match screw length VENT WINDOW and DOOR HARDWARE x2 Transom Window 3 4 1 9 cm x8 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged seperately spe...

Страница 8: ...R SHED You will need these additional materials REINFORCED WOOD FLOOR FRAME OPTIONAL FOUNDATION OR FLOOR MATERIALS ADDITIONAL MATERIALS This shed does not include any floor or leveling materials Use o...

Страница 9: ...sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2 x 4...

Страница 10: ...T be treated lumber 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm x3 x1 x40 x40 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 40 Nails 3 7 6 cm Hot Dipped Galvanized Box Type Nails 3 7 6 cm 2 5 1 cm 3...

Страница 11: ...r 8 thickness Asphalt Shingles 8 Block 4 Block Gravel Gravel Do not exceed 16 4x4 Runner Shingle Shingle Maximum between leveling material locations 48 12 2x4 Treated Lumber 2 Block Level 12 3 Screws...

Страница 12: ...ill be approximately 173 1 16 439 6 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Se...

Страница 13: ...ded HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls EAVE WALL EAVE...

Страница 14: ...floor and 2 UY parts x2 2 x 4 x 6 1 2 5 1 x 10 2 x 16 5 cm UY BEGIN 1 96 3 4 245 7 cm UY x2 Secure 1 UY flush to the floor deck with 2 3 screws Fig A Measure over 96 3 4 243 8 cm and install a second...

Страница 15: ...gusset on CNA holding a 1 4 gap from edge Fig B and keeping rafters firm as instructed Secure the gusset to the rafters with 12 2 nails in the pattern shown Fig B Place 2 rafters CNA in the jig as sh...

Страница 16: ...ANT Build your door header before building any walls see page 15 8 x 12 Wall 01 Page 17 Wall 02 Page 19 Wall 03 Page 21 Build 2 eave walls 8 x 12 Wall 02 Page 19 Build 2 gable walls Wall 03 Page 21 Wa...

Страница 17: ...1 AM and OSB end to end on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN...

Страница 18: ...ame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Bloc...

Страница 19: ...osition 2 Flush Arrange parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown Fig A Secure with 2 3 nails at each connection Fasten 3 middle parts UY...

Страница 20: ...ed 6 apart on edges Install the right panel flush to installed panel as shown Ensure 64 162 8 cm door measurement Secure panels with 2 nails spaced 6 apart on edges 2x4 2 5 1 cm x90 6 15 2 cm BEGIN HE...

Страница 21: ...RTS REQUIRED x20 3 7 6 cm HINT For easier nailing stand on frame BEGIN 1 Arrange parts on edge on floor Measure and mark Secure with 2 3 nails at each mark x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI T...

Страница 22: ...ark the 3 4 measurement on the wall stud Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel FINISH 3 Your 8 WALL 02 is now assembled Carefully flip the gable wall over Ins...

Страница 23: ...2 WALL 03 PARTS REQUIRED x24 3 7 6 cm BEGIN 1 Arrange parts on edge on floor Measure and mark Secure with 2 3 nails at each mark and 4 3 nails at seams x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x2 2...

Страница 24: ...the wall stud Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel 2x4 6 15 2 cm 6 15 2 cm 1 1 2 3 8 cm 3 1 2 8 9 cm 12 30 5 cm 12 30 5 cm FINISH 2x4 Flush Flush Flush Flus...

Страница 25: ...x 68 1 2 5 1 x 10 2 x 174 cm YFA x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI HVC YFA YFA HVC TJ TJ HVC AI x5 UY x3 Seam 3 7 6 cm Screws x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x2 2 x 4 x 92 5 8 5...

Страница 26: ...t panel flush to installed panel as shown Ensure 64 162 8 cm door measurement Secure panel with 2 nails spaced 6 apart on edges 2x4 6 15 2 cm Flush Flush 4 3 64 162 6 cm Install 48 x 84 panel flush to...

Страница 27: ...YOUR WALLS OPTIONAL DOOR LOCATED ON EAVE WALL STANDARD DOOR LOCATED ON GABLE WALL The following steps show how to stand and secure your walls These instructions are by default with the door on the 8...

Страница 28: ...overlap is to the top OO BEGIN 1 1 2 3 8 cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor...

Страница 29: ...into floor frame Fig C Nail panel to 8 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 12 wall is now installed FINISH 2 5 1 cm x27 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQ...

Страница 30: ...spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall with 1 2 screw through g...

Страница 31: ...top plates with 1 3 screw at both corners angled as shown Fig D 3 4 1 1 2 3 8 cm Nails 3 7 6 cm Screw Place 8 gable wall on floor centered between installed walls Secure wall with 1 2 screw through th...

Страница 32: ...h 2 3 nails spaced every 24 Fig A 2 Secure from bottom with 2 3 screws at each corner Fig B Fig B 3 7 6 cm Screws Fig A x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP DOOR Ensure doubler seams are non aligned...

Страница 33: ...gable panel on UY and CQA Secure with 1 1 2 nails as shown 1 BEGIN 3 Repeat steps to build the 2nd gable assembly Your 2 gable assemblies are completed FINISH Flush x16 1 1 2 3 8 cm x2 2 x 4 x 6 1 2...

Страница 34: ...x 4 x 61 7 8 5 1 x 10 2 x 157 2 cm CMA x12 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x56 x4 Fig A Fig D Flush Flush Flush Flush Flush 3 7 6 cm Screws Flip over gable frame sub assembly and attac...

Страница 35: ...ure with 1 5 8 screws as shown Fig E 4 Arrange gable and ladder assemblies as shown Fig E You will build 2 gable units Fig E x2 Gable Assemblies Flush Flush Flush 1 5 8 4 1 cm Screws Repeat STEP 4 to...

Страница 36: ...e aligned over studs as shown Secure with 3 screws Secure rafter to top plate with 2 3 screws above notch Fig B C Your rafters are now installed 3 BEGIN 1 Locate first rafter on top plate Fig A aligne...

Страница 37: ...o wall doubler Secure with 2 nails spaced 6 apart as shown Your gable units are now installed FINISH 2 5 1 cm x36 CQA 3 7 6 cm Screws NAIL FIRST 2 5 1 cm NAIL FIRST 2 5 1 cm 6 15 2 cm Fig A WALL DOUBL...

Страница 38: ...anel with 2 nails in the corners Note Install all roof panels with the rough side up painted grid lines 48 x 96 3 4 1 9 cm Fig A Gauge Block Move Gable 2 nail in each corner 2 nail in each corner Move...

Страница 39: ...l side to side until the corner is flush to the rafter end Fig B Move gable end rafter edge until it is 3 8 from the panel Fig C Secure panel with 2 nails in the corners 7 16 x 48 x 47 7 8 1 1 x 121 9...

Страница 40: ...h 2 nails in each corner 5 6 13 7 8 x 96 13 7 8 x 48 7 Fig D Maintain spacing between the center of the rafters for the lower panels Fig D Secure panels with 1 2 nail into the rafters as shown Move to...

Страница 41: ...with 2 nails in each corner 8 8 1 2 x 13 7 8 8 1 2 x 13 7 8 8 1 2 x 48 8 1 2 x 48 Your roof panels are now installed FINISH Repeat all steps to install roof panels on the opposite side PARTS REQUIRED...

Страница 42: ...rd Fig D Secure with 12 2 finish nails Repeat steps to attach soffit boards on the opposite side x4 3 8 x 7 7 8 x 59 15 16 1 x 20 x 152 2 cm x48 2 5 1 cm 2 1 BEGIN Your gable soffit panels are now ins...

Страница 43: ...and 4 nails angled at the seam Fig C Repeat steps to install eave side soffit boards on the opposite side x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x32 2 5 1 cm 1 BEGIN Your eave side soffit panels...

Страница 44: ...nstall fascia boards on the other gable end Your gable fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 62 7 16 1 x 12 1 x 158 6 cm x2 3 8 x 4 3 4 x 62 7 16 1 x 12 1 x 15...

Страница 45: ...end and 4 nails angled at the seam Repeat steps to install fascia on the opposite eave Your eave side fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED x4 3 8 x 4 3 4 x 80 5 8 1 x 12 1 x...

Страница 46: ...1 5 8 4 1 cm 2 3 Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with 2 1 5 8 screws OO GAA OFFSET 4 3 7 6 cm Screws 2 1 1 4 3 cm Screws Bottom ed...

Страница 47: ...doors Screw hinge boards into wall supports and floor with 10 3 screws as shown Make sure screws go into framing and floor Fig C D 6 3 7 6 cm Screws into the wall support and floor frame Fig B SEAM F...

Страница 48: ...1 4 28 6 cm Center metal threshold between doors secure using eleven 3 4 special coating screws Fig C 5 Your door and trim are now secured FINISH BEGIN 1 2 Secure two horizontal door rails AH with 4 3...

Страница 49: ...inside edge of door Mark center of window opening on door Position window in opening flush to bottom of window opening Center window on mark Secure with 4 screws to secure each window 2 Apply high qua...

Страница 50: ...dge of door Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH Repeat steps to install OO on right door Secure with 7 2 screws through outside trim into OO Fig B 2 Fig A Center OO in door open...

Страница 51: ...side of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit Your door is now prepared for handle insta...

Страница 52: ...50 DOOR HARDWARE PARTS REQUIRED 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit x1 1 1 4 3 2 cm x2 Handle locking with Screws RIGHT DOOR Set Screw 1 1 4 Wood Screws Secure handle with 1 1 4 screws as shown...

Страница 53: ...ll bit 2 BEGIN 1 LEFT DOOR Fig B Your spring bolts are now installed Fig A Flush Flush 69 175 3 cm Door Stiffener 69 175 3 cm Door Stiffener 3 8 drill for bolt 1 1 2 deep 3 8 drill for bolt 1 1 2 deep...

Страница 54: ...1 7 8 on eave walls 82 1 2 on gable wall Install gable end 82 1 2 corner trim flush to gable panel Fig A and flush with eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave s...

Страница 55: ...For best appearance install collar ties on rafters facing away from double door opening x12 2 5 1 cm GUA 2nd Rafter 2nd Rafter GUA GUA Flush Flush 2 5 1 cm Nails LEVEL Your collar ties are now install...

Страница 56: ...e wall as shown Seal vent from behind with exterior grade caulk before installing Your vents are now installed Secure vent with 1 screws GABLE VENTS Repeat to install 2nd vent in the opposite gable x8...

Страница 57: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 58: ...hang at back and bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingl...

Страница 59: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Страница 60: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 61: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 62: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 63: ...K 84004800520 1 Backwall Sidewall Panel SIDING NGSE 3 8X4 X7 11507 8 Gable Panels w Hole RIGHT 3 8 NGX28 X48 RT GABLE HOLE K 48002800100 2 Gable Panels w Hole LEFT 3 8 NGX28 X48 LT GABLE HOLE K 480028...

Страница 64: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...

Отзывы: