28
PARTS REQUIRED:
12' WALL 03 INSTALLATION (2nd 12' wall)
3" (7,6 cm)
x1
3" (7,6 cm)
x12
2" (5,1 cm)
x27
4
Nail 12' wall panel to 8' wall stud with 1-1/2"
nails spaced 6" apart.
Your 2nd 12' wall is now installed.
FINISH
3" (7,6 cm)
Nails
1-1/2" (3,8 cm)
x13
Secure gable wall top plate with (1) 3" screw
at the corner at an angle as shown
(Fig. D)
.
5
3
Nail lower edge of wall panels
to floor frame with 2" nails
spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Secure wall bottom plates to floor
with 3" nails
(Fig. C)
.
1-1/2" (3,8 cm)
Nails
6" (15,2 cm)
3" (7,6 cm)
Screw
Fig. D
6"
(15,2 cm)
Secure wall with (1) 2" screw through
gable wall panel into 8' wall bottom
and top plates
(Fig. B, Fig. A)
.
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
2
BEGIN
1
Remove temporary brace
OO
from
installed 8' wall.
Place 12' wall centered on floor.
1-1/2" (3,8 cm) overlap is to the top.
Nail 2" nails first.
2"
(5,1 cm)
Nails
3"
(7,6 cm)
Nails
Fig. C
Flush
2" (5,1 cm)
Screw
Fig. B
Fig. A
2"
(5,1 cm)
Screw
1-1/2"
(3,8 cm)
2" (5,1 cm)
x2
Содержание GABLE 8 x 12
Страница 2: ...This page intentionally left blank...