STEP 9
Turn the Monkey Bar assembly
over and put into position. Secure
the Monkey Bar assembly to
Sculptured Rail G2 with 1-1/4” Hex
Head Bolts, Lock Washers, Flat
Washers and Spike T Nuts
according to the bolting diagram
shown below. Also 2” Lag Bolt,
Lock Washers and Flat Washers.
Drill 3/8” hole thru Sculptured Rail, refer to step 1
GREEN METAL
BRACKET
Sculptured Rail G2
FLAT
WASHER
BOLT
LOCK
WASHER
BO
ARD
FLAT
WASHER
BARREL
NUT
5/16"
Metal stake installation: measure in 8” from outside edge of G1
ground board for ground stake location. Then screw stake into
ground using a long screw driver for leverage until stake is
approximately 1 " down from top of ground board. Now using a 3/8"
drill bit and hole in stake as guide, drill thru ground board and attach
using 1" Phillips Truss Head Bolt, Flat Washers and Lock Washer
with Barrel Nut.
In some cases you may need to dig hole attach stake to board then
fill with cement keeping below ground level.
STEP 10
G1
G2
Lag Bolt
Hex Bolt
Hex Bolt
Lag Bolt
Meijer.com
Содержание Cedar Mountain 5007
Страница 3: ...Meijer com...