STEP 9
Attach G1 Front and Back Baseboards, placing
flush with outside of C2 and C3 Posts,pilot drill
with 3/16" bit using holes in G1 as guide and
attach using 5/16x2-1/2” Lag Screws, Internal
Tooth Lock Washers and Flat Washers.Center C1
post straight up and down and finish attaching G1
using 2 1/2" lag screws,lock washers and flat
washers.
STEP 10
Attach G5 Left Baseboard to C2 Post, flushing
with outside of G1 Baseboards, pilot drill with
3/16"bit using holes in G5 as guide and attach
using 5/16x2-1/2” Lag Screws, Internal Tooth
Lock Washers and Flat Washers.
C1
C1
C1
C1
C2
C2
C2
C2
C3
C3
G1
G1
G1
G1
G5
H3
H6
H8
1 x 5-1/2 x 78-1/2 [ 2.54 x 13.97 x 199.39 ]
G1 Base Board * 6 Holes * 2 Req
1 x 5-1/2 x 47 [ 2.54 x 13.97 x 119.38 ]
G5 Base Board * 6 Holes * 1 Req
5/16 X 2-1/2"
LAG
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
© Leisure Time Products Inc.
Next Generation 5007 10-0409 Version 4
Page 15
Meijer.com
Содержание Cedar Mountain 5007
Страница 3: ...Meijer com...