CHAPTER 4 –
Installation
Chap. 4
-
5
/20 -
4.1.2 Installation equipment provided by the customer
INSTALLATION EQUIPMENT
1 of 1
EQUIPMENT
Extension leads
Drill with drill bits
Grinding wheel with disks for metal
Welding machine
4.1.3 Installation preparations made by the customer
The installation site must be equipped with the following:
•
220 volt power supply points, close to the machine assembly site, to which the different work
equipment (drills, welding machine etc.) can be connected
•
A telephone line with Internet access.
•
Any necessary civil works must be implemented and the foundations and/or installation site must
be prepared.
Содержание Twin
Страница 4: ...TWIN Use and maintenance instruction manual Cap 0 IV 4 Page intentionally left blank ...
Страница 5: ...CHAPTER 1 Foreword Chap 1 1 14 CHAPTER 1 Foreword ...
Страница 7: ...CHAPTER 1 Foreword Chap 1 3 14 Page intentionally left blank ...
Страница 18: ...TWIN Use and maintenance instruction manual Chap 1 14 14 Page intentionally left blank ...
Страница 19: ...CHAPTER 2 Safety information Chap 2 1 52 CHAPTER 2 Safety information ...
Страница 71: ...Chap 3 1 28 CHAPTER 3 Machine description and technical data CHAPTER 3 Machine description and technical data ...
Страница 98: ...TWIN Use and maintenance instruction manual Chap 3 28 28 Page intentionally left blank ...
Страница 99: ...CHAPTER 4 Installation Chap 4 1 20 CHAPTER 4 Installation ...
Страница 119: ...CHAPTER 5 Controls and use Chap 5 1 48 CHAPTER 5 Controls and use ...
Страница 166: ...TWIN Use and maintenance instruction manual Chap 5 48 48 Page intentionally left blank ...
Страница 167: ...CHAPTER 6 Maintenance Chap 6 1 32 CHAPTER 6 Maintenance ...
Страница 198: ...TWIN Use and maintenance instruction manual Chap 6 32 32 Page intentionally left blank ...
Страница 199: ...CHAPTER 7 Attached documentation and diagrams Chap 7 1 4 7 Attached documents and diagrams CHAPTER ...
Страница 202: ...TWIN Use and Maintenance Instruction Manual Chap 7 4 4 Page intentionally left blank ...