Optional Accessory
Installation
Fill Access Platform
Side Ladder
Fill Access Platform
End Ladder
Fill Access Platform End Ladder (Optional)
1. Attach the upper ladder supports LA7 to the ladder if not already installed and then
attach the ladder assembly to the platform using the 3/8” x 1 1/4” bolts provided. See
Figure 47, Detail B
.
2. Secure the ladder flares to the platform railing posts using the 5/16” x 3 1/2” bolts
provided. See
Figure 47, Detail A
.
3. Install the lower ladder supports per
Figure 47, Detail C
, as follows:
–
Loosely assemble the support channels PHE, PHF, PHG and PHD using the 3/8” x
1 1/4” bolts provided and then loosely attach this assembly to the factory installed
channel
–
Attach the support assembly to the ladder with the ladder clamps PDC and PDB
using the 3/8” x 1 1/4” bolts provided.
–
Tighten all hardware to secure the support.
Figure 47.
Fill Access Platform End Ladder – All units
Detail A
Detail B
Detail C
LA7
PHG
PHF
PDC + PDB
PHE
PHD