![BAC PCC Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/bac/pcc-series/pcc-series_rigging-and-assembly-instructions_464446010.webp)
WWW.BALTIMOREAIRCOIL.COM
8
Rigging of Containerized Units (PFi/PCC-0709 and PFi/PCC-0718)
1. Remove the unit from the container using the pulling lugs as shown in
Figure 9
.
2. Containerized units ship in two parts within the container, where the mechanical
section is bolted to the lower section and the coil casing section is separate. Once the
unit is removed from container, remove the bolts holding the mechanical section to
the lower section and remove the mechanical section from the lower section.
3. Remove any motors or accessories shipped in the lower section.
4. Install rigging alignment pins on the cold water basin in the locations shown in
Figure
4
. Secure the alignment pins using the 1/2” hardware provided.
5. Position the lower section on the unit support and bolt into place.
6. Follow steps 6 – 11 on
7. The motor for containerized units ships loose. Attach the motor to the fan section per
“Motor Installation for External Motors” on
8. Follow steps 12 – 16 on
page 7
.
9. Secure the pump/piping assembly to the basin using the flat butyl sealer tape (BAC
Part #554000) and bolts provided as shown in
Figure 10
. Apply the sealer tape as
shown in
Figure 10, Detail B
.
10. Secure the pump piping to the pump piping bracket with the U-bolt provided.
11. Position the rubber sleeve connecting the sections of the pump discharge pipe and
secure with the hose clamps provided.
Figure 10.
Bolt/Piping Assembly
Sealer Tape
Pump Mounting
Plate
Flat
Washer
3/8”x 1 1/4”
Bolt (8 Places)
Basin Panel
(Inside
Surface)
Nut
Lock Washer
Flat Washer
Detail A
Detail B
U-Bolt
Figure 9.
Removing Unit from Container Using Pulling Lugs