1 Construction Details
1 Construction Details
W W W . B A L T I M O R E A I R C O I L . E U
3
CONSTRUCTION DETAILS
BCP2D
1.
Fluid inlet coupling
2.
Fluid outlet coupling
3.
Bleed
4.
Controller
5.
Conductivity probe
6.
Sampling point
7.
Bleed valve
8.
Insulation valve
9.
Flow controller
10. Chemical injection
11. Pump oxidizing biocide
12. Pump scale/corrosion inhibitor
13. Chemical drum
14. Retention
15. Water meter
16. Suction tubing
17. Discharge tubing
BCP2D
1