background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

19

HIGH LIMIT THERMOSTAT REPLACEMENT

1. 

Ensure electrical supply is isolated to boiler

2. 

The high limit thermostat can be found fixed to top 
front face of boiler.

3. 

Remove 2 terminal connectors from high limit 
thermostat loosen retaining straps and slide 
thermostat out from behind. 

4. 

Important when replacing thermostat ensures a heat
sink compound is used between back of thermostat 
and face of boiler. (See diagram for positioning)

5. 

Inspect retaining straps and replace where necessary.

THERMISTOR REPLACEMENT

1. 

Isolate electrical supply to boiler.

2. 

Thermistor is located fixed to top front of boiler 
above high limit thermostat.

3. 

Disconnect from PCB board and slide out from 
behind retaining strap.

4. 

Important when replacing thermistor ensure a heat 
sink compound is used between thermistor and boiler
body. (See diagram for positioning)

5. 

Inspect retaining strap and replace where necessary.

6. 

When replacing front casing, ensure the thermostat 
control shaft passes through hole in front control panel.

ELEMENT REPLACEMENT

1. 

Isolate electrical supply to boiler.

2. 

Drain down system.

3. 

Disconnect terminal connectors from high limit thermostat.

4. 

Remove thermistor from behind retaining strap.

5. 

Disconnect electrical elements and earth wire.

6. 

Disconnect compression fitting top and bottom of boiler.

7. 

Remove securing bracket on bottom of boiler then 
carefully remove top bracket.

8. 

Boiler unit can now be carefully removed.

9. 

Remove eight fixing screws on top flange and with
draw element assembly.

10.  Remove bottom element positioning bracket.

11.  Remove damaged element.

12.  Refit in reverse order ensure element seals are fitted.

13.  Check for continuity through two terminals on each 

element.

IMPORTANT
Inspect all seals and change where necessary

COOLING FAN REPLACEMENT (9, 11 & 12 kW
MODELS ONLY)

1. 

Ensure electrical supply is isolated to boiler.

2.

Remove the four casing screws (2 at top/2 at bottom)
lift up the top casing and carefully slide off the 
front casing panel.

3.

Taking note of which cable goes to which element, 
disconnect all elements apart from the rear element.

4.

Remove the grey pipe insulation, after pipe insulation
is removed it is now possible to disconnect the 
remaining element.

5.

For ease of access disconnect the mains input cable
from the main terminal block, also disconnect the 
pump cable from its terminal block.

6.

Now unscrew the two terminal block fixing screws, 
freeing the pump terminal block from the back panel.

7.

Remove both the screws holding the fan cover 
(situated just behind the flow pipe).

8.

Now lift out the cover from the LHS of the appliance.

9.

Noting its position remove the fan by disconnecting 
the plug from PCB and removing all 2 fixing screws.

10. Re-fit in reverse order _ on re-assembly always 

refer to wiring diagram.

NOTE: 

Ensure that the fan is fitted in the correct 
orientation (label to face front of boiler).

45

60

Limit
Stat

Thermistor

Jubilee Clip

FIG. 23

FIG. 23

           

Содержание EB 897 01

Страница 1: ...er commissioning is carried out b It is a requirement of the boiler s guarantee and any extended warranty that an annual service is carried out by a qualified engineer Installation Engineer s Signatur...

Страница 2: ...nce may contain some of the items below When working on the appliance it is the Users Engineers responsibility to ensure that any necessary personal protective clothing or equipment is worn appropriat...

Страница 3: ...learance dimensions Power Supply and Wiring The power supply to the premises must meet the minimum requirements of the unit being installed with special attention paid to the supply current cable size...

Страница 4: ...ares List 22 23 Important General Information To keep your boiler running efficiently DO NOT OBSTRUCT OR COVER any ventilation air inlet on the appliance or the compartment where it is installed To ke...

Страница 5: ...N THIS APPLIANCE BY ANY THIRD PARTY WILL NOT BE ACCEPTED BY TRIANCO A step by step guide to reporting a fault with your appliance A qualified field SERVICE ENGINEER is available to attend a breakdown...

Страница 6: ...EN60335 1 1994 A16 2001 EN60335 2 35 1998 A1 2000 EN55014 1 2000 EN55014 2 1997 EN61000 3 2 2000 and EN61000 3 3 1995 THE PERSON S WHO INSTALLS THIS APPLIANCE SERVICES OR CARRIES OUT ANY REMEDIAL WOR...

Страница 7: ...wer on to the boiler AMBER Illuminated In run mode Flashing Temperature Satisfied RED Boiler Fault If the red LED light flashes this means a fault has occurred This would result in the boiler continui...

Страница 8: ...Check for blown fuse or thrown power breaker If replacement fuse or power breaker fail again call service engineer If the red LED is permanently illuminated contact your service engineer Flashing red...

Страница 9: ...l during such times When installed in a compartment with a hot water cylinder see Fig 1 we recommend that the boiler is fitted in position 1 if fitted in position 2 provision should be made at the fro...

Страница 10: ...p casing panel and cut off end to allow pipe to slide through see diagram IMPORTANT TOP CASING PANEL WITH GROMMET MUST BE RE FITTED BACK IN POSITION BEFORE MAKING TOP PIPE CONNECTION 9 When re fitting...

Страница 11: ...pe expansion vessel conforming to the current issue of BS4814 The expansion vessel must be connected to the systems at a point close to the inlet side of the circulating pump The expansion vessel volu...

Страница 12: ...er power demand the PCB circuit protection fuse may require up rating from the 630ma one supplied as standard Alternatively the pump could be wired using a relay See Wiring Instructions page 10 for fu...

Страница 13: ...led System 3 port valve Aztec Boiler Drain Valve CENTRAL HEATING DHW CYLINDER air vent Safety Valve Pressure Gauge Expansion Vessel Bypass valve Alternative pump position Auto Air Vent PUMP Service Va...

Страница 14: ...f 100A per phase and meet the requirements of IEC 60417 5855 The 12 kW boiler must be installed in premises having a NOTE RCD UNIT can be used as the isolating switch if mounted close enough to the bo...

Страница 15: ...HECKED LOOSE CONNECTIONS CAN CAUSE PROBLEMS WARNING THIS APPLIANCE MUST BE EARTHED 1 Any exposed pipe work must be earthed in accordance with IEE regulations 2 On completion of installation all electr...

Страница 16: ...ING SHOWING 1 ELEMENTS 2 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CALL SIGNAL INTO SL TERMINAL IMPORTANT...

Страница 17: ...Tel 0161 620 6677 13 INTERNAL WIRING SHOWING 3 ELEMENTS 6 9 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CAL...

Страница 18: ...0161 620 6677 14 INTERNAL WIRING SHOWING 4 ELEMENTS 11 12 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CALL...

Страница 19: ...By www heating spares co Tel 0161 620 6677 MODEL SUPPLY BOILER RATING CURRENT MCB RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50A 12Kw 51A 63A 15 WIRING DIAGRAM FOR HEATING ONLY GREY SL FIG...

Страница 20: ...w heating spares co Tel 0161 620 6677 16 WIRING DIAGRAM FOR Y PLAN CONTROL SYSTEM MODEL SUPPLY RATING BOILER CURRENT MCB RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50A 12 Kw 51A 63A ORANGE...

Страница 21: ...heating spares co Tel 0161 620 6677 17 WIRING DIAGRAM FOR S PLAN CONTROL SYSTEM FIG 21 GREY SL ORANGE FIG 21 MODEL SUPPLY RATING BOILER CURRENT RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50...

Страница 22: ...element 6 With all elements disconnected again taking note of wiring arrangement carefully disconnect and remove the element cables from the PCB Important care MUST be taken when handling the PCB 7 Di...

Страница 23: ...on bottom of boiler then carefully remove top bracket 8 Boiler unit can now be carefully removed 9 Remove eight fixing screws on top flange and with draw element assembly 10 Remove bottom element posi...

Страница 24: ...d By www heating spares co Tel 0161 620 6677 20 WIRING ARRANGEMENTS FOR AZTEC 11 12 KW MODELS ON AZTEC 6 9KW MODELS ELEMENT 1 CONNECTIONS ARE NOT USED ELEMENT JUMPER NOT USED ON 6 9 KW BOILERS FIG 24...

Страница 25: ...here is a break in the element cable this would show up as a fault Check all element cables and connections PCB Running Temperature The PCB control unit has a built in temperature control sensor which...

Страница 26: ...ares co Tel 0161 620 6677 18 8 10 11 2 21 20 1 14 9 12 19 15 7 22 17 18 5 16 17 16 18 11 10 6 23 4 18 3 25 24 B L N E A C A B C 19 13 24 25 12 19 33 31 22 29 27 30 26 43 34 28 35 39 38 32 40 35 16 16...

Страница 27: ...W 1 221880 3 E94 759 PCB Control Unit 2kW 1 222558 3 E94 760 PCB Control Unit 6 9 11 12 kW 1 221823 4 E94 761 2 kW Electric Element 2 kW boiler 1 221838 4 E94 762 2 kW Electric Element 6 kW boiler 3 2...

Страница 28: ...uk Trianco Limited Copyright in this brochure and the drawings or illustrations contained in it is vested in Trianco Limited and neither the brochure or any part thereof may be reproduced without pri...

Отзывы: