background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

18

5. SERVICING

To ensure reliable operation of your Aztec electric boiler,
it is recommended that you have your boiler serviced
once a year.

The person(s) who services or carries out any 
remedial work, ie electrical fault finding, must have
suitable engineering qualifications.

Isolate mains supply before carrying out any service
work.

1.  Check all electrical connections on PCB and electric 

elements to ensure they are secure and clean

2.  Check electrical insulation on wiring.

3.  Inspect fan unit (9, 11 and 12kW boilers) and clean 

away any deposits

4.  Ensure all air grilles are clean and free from 

obstructions.

5.  Inspect seals around elements and also the heat 

exchanger top and bottom flanges.

PCB ASSEMBLY REPLACEMENT

Note: The PCB is supplied with the element jumper fitted
suitable for 11kW and 12kW boilers.When fitted to a 6kW
or 9kW boiler, the element jumper must be removed. This
is not applicable to the 2kW unit.

1. 

Ensure electrical supply is isolated to boiler.

2.

Remove the 4 fixing screws and washers (2 at top/2
at bottom), lift up the top-plate and carefully slide off
the front casing panel.

3.

Disconnect the Pump + Call plug, the Thermistor 
plug and the fan (where fitted) and high limit stat. 
plug.

4.

Disconnect all element cables apart from the rear 
element. N.B. Take note of wiring arrangement 
before disconnecting.

5.

Now remove the grey pipe insulation, it is now 
possible to disconnect the remaining element.

6.

With all elements disconnected, again taking note of
wiring arrangement, carefully disconnect and remove
the element cables from the PCB.

Important: care MUST be taken when handling the PCB.

7.

Disconnect the remaining red + black power cables
from the PCB.

8.

For ease of access disconnect from the main terminal
block both the red + black cables and also the 
power input cables, leaving the earth cable connected

9.

Free both the pump and call terminal blocks by 
removing the terminal block fixing screws.

10. Now remove the fan cover from the LHS of the unit 

by removing  the 2 fixing screws situated just behind 
the flow pipe.

11. Remove the fan from the back panel by removing the

2 fixing screws.

12. Now remove the screws which fasten the pipe 

bracket/air duct to the aluminium heatsink.

13. Finally remove the 4 fixing screws holding the 

heatsink in position and allow the PCB assembly to 
drop down about an inch before removing from the 
RHS of the unit.

14. Re-fit in reverse order _ on re-assembly always 

refer to wiring diagram.

4 FIXING 
SCREWS

PCB 
CONTROL
UNIT

HEAT SINK 
PLATE

FIXING SCREWS
TOP AND BOTTOM

PARTS REPLACEMENT

CASING REMOVAL

IMPORTANT
Isolate mains electrical supply to the boiler before carrying
out any maintenance work.

1. 

Isolate electrical supply to boiler.

2. 

Remove 4 fixing screws securing front casing in 
position.

3. 

Slide top casing upwards this will allow front casing 
to slide forward.

IMPORTANT: All electrical connections should be
checked. Loose connections can cause problems.

This boiler is fitted with a manual reset high limit 
thermostat. Before replacing any part, ensure that the
thermostat does not require re-setting.

FIG. 22

             

Содержание EB 897 01

Страница 1: ...er commissioning is carried out b It is a requirement of the boiler s guarantee and any extended warranty that an annual service is carried out by a qualified engineer Installation Engineer s Signatur...

Страница 2: ...nce may contain some of the items below When working on the appliance it is the Users Engineers responsibility to ensure that any necessary personal protective clothing or equipment is worn appropriat...

Страница 3: ...learance dimensions Power Supply and Wiring The power supply to the premises must meet the minimum requirements of the unit being installed with special attention paid to the supply current cable size...

Страница 4: ...ares List 22 23 Important General Information To keep your boiler running efficiently DO NOT OBSTRUCT OR COVER any ventilation air inlet on the appliance or the compartment where it is installed To ke...

Страница 5: ...N THIS APPLIANCE BY ANY THIRD PARTY WILL NOT BE ACCEPTED BY TRIANCO A step by step guide to reporting a fault with your appliance A qualified field SERVICE ENGINEER is available to attend a breakdown...

Страница 6: ...EN60335 1 1994 A16 2001 EN60335 2 35 1998 A1 2000 EN55014 1 2000 EN55014 2 1997 EN61000 3 2 2000 and EN61000 3 3 1995 THE PERSON S WHO INSTALLS THIS APPLIANCE SERVICES OR CARRIES OUT ANY REMEDIAL WOR...

Страница 7: ...wer on to the boiler AMBER Illuminated In run mode Flashing Temperature Satisfied RED Boiler Fault If the red LED light flashes this means a fault has occurred This would result in the boiler continui...

Страница 8: ...Check for blown fuse or thrown power breaker If replacement fuse or power breaker fail again call service engineer If the red LED is permanently illuminated contact your service engineer Flashing red...

Страница 9: ...l during such times When installed in a compartment with a hot water cylinder see Fig 1 we recommend that the boiler is fitted in position 1 if fitted in position 2 provision should be made at the fro...

Страница 10: ...p casing panel and cut off end to allow pipe to slide through see diagram IMPORTANT TOP CASING PANEL WITH GROMMET MUST BE RE FITTED BACK IN POSITION BEFORE MAKING TOP PIPE CONNECTION 9 When re fitting...

Страница 11: ...pe expansion vessel conforming to the current issue of BS4814 The expansion vessel must be connected to the systems at a point close to the inlet side of the circulating pump The expansion vessel volu...

Страница 12: ...er power demand the PCB circuit protection fuse may require up rating from the 630ma one supplied as standard Alternatively the pump could be wired using a relay See Wiring Instructions page 10 for fu...

Страница 13: ...led System 3 port valve Aztec Boiler Drain Valve CENTRAL HEATING DHW CYLINDER air vent Safety Valve Pressure Gauge Expansion Vessel Bypass valve Alternative pump position Auto Air Vent PUMP Service Va...

Страница 14: ...f 100A per phase and meet the requirements of IEC 60417 5855 The 12 kW boiler must be installed in premises having a NOTE RCD UNIT can be used as the isolating switch if mounted close enough to the bo...

Страница 15: ...HECKED LOOSE CONNECTIONS CAN CAUSE PROBLEMS WARNING THIS APPLIANCE MUST BE EARTHED 1 Any exposed pipe work must be earthed in accordance with IEE regulations 2 On completion of installation all electr...

Страница 16: ...ING SHOWING 1 ELEMENTS 2 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CALL SIGNAL INTO SL TERMINAL IMPORTANT...

Страница 17: ...Tel 0161 620 6677 13 INTERNAL WIRING SHOWING 3 ELEMENTS 6 9 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CAL...

Страница 18: ...0161 620 6677 14 INTERNAL WIRING SHOWING 4 ELEMENTS 11 12 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CALL...

Страница 19: ...By www heating spares co Tel 0161 620 6677 MODEL SUPPLY BOILER RATING CURRENT MCB RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50A 12Kw 51A 63A 15 WIRING DIAGRAM FOR HEATING ONLY GREY SL FIG...

Страница 20: ...w heating spares co Tel 0161 620 6677 16 WIRING DIAGRAM FOR Y PLAN CONTROL SYSTEM MODEL SUPPLY RATING BOILER CURRENT MCB RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50A 12 Kw 51A 63A ORANGE...

Страница 21: ...heating spares co Tel 0161 620 6677 17 WIRING DIAGRAM FOR S PLAN CONTROL SYSTEM FIG 21 GREY SL ORANGE FIG 21 MODEL SUPPLY RATING BOILER CURRENT RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50...

Страница 22: ...element 6 With all elements disconnected again taking note of wiring arrangement carefully disconnect and remove the element cables from the PCB Important care MUST be taken when handling the PCB 7 Di...

Страница 23: ...on bottom of boiler then carefully remove top bracket 8 Boiler unit can now be carefully removed 9 Remove eight fixing screws on top flange and with draw element assembly 10 Remove bottom element posi...

Страница 24: ...d By www heating spares co Tel 0161 620 6677 20 WIRING ARRANGEMENTS FOR AZTEC 11 12 KW MODELS ON AZTEC 6 9KW MODELS ELEMENT 1 CONNECTIONS ARE NOT USED ELEMENT JUMPER NOT USED ON 6 9 KW BOILERS FIG 24...

Страница 25: ...here is a break in the element cable this would show up as a fault Check all element cables and connections PCB Running Temperature The PCB control unit has a built in temperature control sensor which...

Страница 26: ...ares co Tel 0161 620 6677 18 8 10 11 2 21 20 1 14 9 12 19 15 7 22 17 18 5 16 17 16 18 11 10 6 23 4 18 3 25 24 B L N E A C A B C 19 13 24 25 12 19 33 31 22 29 27 30 26 43 34 28 35 39 38 32 40 35 16 16...

Страница 27: ...W 1 221880 3 E94 759 PCB Control Unit 2kW 1 222558 3 E94 760 PCB Control Unit 6 9 11 12 kW 1 221823 4 E94 761 2 kW Electric Element 2 kW boiler 1 221838 4 E94 762 2 kW Electric Element 6 kW boiler 3 2...

Страница 28: ...uk Trianco Limited Copyright in this brochure and the drawings or illustrations contained in it is vested in Trianco Limited and neither the brochure or any part thereof may be reproduced without pri...

Отзывы: