background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

5

4. INSTALLATION

Regulations

Installation of the boiler must comply with the following
British Standards and Regulations:

BS 5449 - Forced Circulation Hot Water Central Heating
Systems.

BS 7074 - Part 1 - Code of Practice for Sealed Water
Systems.

The Building Regulations:
Part ‘L’ (Northern Ireland)
Current I.E.E. Regulations 
Local water undertaking By-Laws

Health & Safety at Work Act

The installer should be aware of his responsibilities under
the Act and provide where necessary, appropriate protection
for persons carrying out the installation. In the interests of
safety a competent engineer should install the boiler and
all wiring must be carried out in accordance with current
IEE wiring regulations.

IMPORTANT

ALL ELECTRICAL WORK MUST BE CARRIED OUT
BY A QUALIFIED ELECTRICAL ENGINEER TO 
CURRENT IEE WIRING REGULATIONS.

SITING THE BOILER

IMPORTANT: NOT TO BE INSTALLED IN A SHOWER
COMPARTMENT OR BATHROOM

The boiler is designed to be fitted in an upright position
only
. Ensure adequate clearance is allowed for making
water connections as the boiler can be fully serviced from
the front. The boiler must also be fitted in a dry well ventilated
position, which is not subject to adverse temperature
conditions. (See Ventilation Requirements)

Care should be taken when siting the appliance to make
sure adequate access is available for future servicing of
the appliance. Please note that the PCB and heat
exchanger assembly may require removal during such times.

When installed in a compartment with a hot water cylinder
(see Fig. 1), we recommend that the boiler is fitted in
position 1; if fitted in position 2, provision should be made
at the front of the boiler to enable the removal of the front
casing. In both cases, where any additional equipment
like a hot water cylinder or system controls are to be fit-
ted after the boiler has been installed, attention should be
given to ensure that they do not restrict access to the
boiler for servicing.

UNPACKING THE BOILER

Carefully open the boiler carton, remove boiler and place
in a safe place until required.

NOTE - ALWAYS STORE THE BOILER IN A DRY
PLACE PRIOR TO FITTING.

FIXING BOILER TO WALL

IMPORTANT:
DO NOT CUT FLOW AND RETURN PIPES

1.  The boiler should be fitted to a suitable wall in an 

upright position. Flow tapping must be at top of boiler.

2.  Using fixing dimensions supplied work out position of 

boiler, mark four mounting holes and drill 6mm diameter
to a depth of 38 mm.

3.  Fit plastic wall plugs into holes and fit bottom two 

mounting screws.

4. Hang boiler on bottom two screws and push the boiler

back towards the wall and secure in position with top 
two fixing screws. The flow tapping must be at top of 
the boiler. 
(continued, page 6)

MINIMUM CLEARANCES:

FRONT

-  150mm

FROM OTHER FIXED EQUIPMENT

TOP

- 100mm

BOTTOM - 100mm

L/H SIDE  -

50mm

R/H SIDE -  100mm

NOTE: APPROXIMATELY 750MM

WILL BE REQUIRED AT THE

FRONT OF THE APPLIANCE TO

ENSURE ADEQUATE ACCESS BY

AN ENGINEER DURING 

ROUTINE SERVICING.

HOT WATER
CYLINDER

1

2

FIG. 1

FIG. 2

FLOW 0 22

RETURN 0 22

FIG. 3

2kW 

6kW 

9 - 12kW

A

566 839 1089

B 586 859 1109

550 

823 

1073

D 107 107  107

E 164 164  164

FIG. 2

FRONT

MIN
150

MIN DIST

ANCE

150MM

                   

Содержание EB 897 01

Страница 1: ...er commissioning is carried out b It is a requirement of the boiler s guarantee and any extended warranty that an annual service is carried out by a qualified engineer Installation Engineer s Signatur...

Страница 2: ...nce may contain some of the items below When working on the appliance it is the Users Engineers responsibility to ensure that any necessary personal protective clothing or equipment is worn appropriat...

Страница 3: ...learance dimensions Power Supply and Wiring The power supply to the premises must meet the minimum requirements of the unit being installed with special attention paid to the supply current cable size...

Страница 4: ...ares List 22 23 Important General Information To keep your boiler running efficiently DO NOT OBSTRUCT OR COVER any ventilation air inlet on the appliance or the compartment where it is installed To ke...

Страница 5: ...N THIS APPLIANCE BY ANY THIRD PARTY WILL NOT BE ACCEPTED BY TRIANCO A step by step guide to reporting a fault with your appliance A qualified field SERVICE ENGINEER is available to attend a breakdown...

Страница 6: ...EN60335 1 1994 A16 2001 EN60335 2 35 1998 A1 2000 EN55014 1 2000 EN55014 2 1997 EN61000 3 2 2000 and EN61000 3 3 1995 THE PERSON S WHO INSTALLS THIS APPLIANCE SERVICES OR CARRIES OUT ANY REMEDIAL WOR...

Страница 7: ...wer on to the boiler AMBER Illuminated In run mode Flashing Temperature Satisfied RED Boiler Fault If the red LED light flashes this means a fault has occurred This would result in the boiler continui...

Страница 8: ...Check for blown fuse or thrown power breaker If replacement fuse or power breaker fail again call service engineer If the red LED is permanently illuminated contact your service engineer Flashing red...

Страница 9: ...l during such times When installed in a compartment with a hot water cylinder see Fig 1 we recommend that the boiler is fitted in position 1 if fitted in position 2 provision should be made at the fro...

Страница 10: ...p casing panel and cut off end to allow pipe to slide through see diagram IMPORTANT TOP CASING PANEL WITH GROMMET MUST BE RE FITTED BACK IN POSITION BEFORE MAKING TOP PIPE CONNECTION 9 When re fitting...

Страница 11: ...pe expansion vessel conforming to the current issue of BS4814 The expansion vessel must be connected to the systems at a point close to the inlet side of the circulating pump The expansion vessel volu...

Страница 12: ...er power demand the PCB circuit protection fuse may require up rating from the 630ma one supplied as standard Alternatively the pump could be wired using a relay See Wiring Instructions page 10 for fu...

Страница 13: ...led System 3 port valve Aztec Boiler Drain Valve CENTRAL HEATING DHW CYLINDER air vent Safety Valve Pressure Gauge Expansion Vessel Bypass valve Alternative pump position Auto Air Vent PUMP Service Va...

Страница 14: ...f 100A per phase and meet the requirements of IEC 60417 5855 The 12 kW boiler must be installed in premises having a NOTE RCD UNIT can be used as the isolating switch if mounted close enough to the bo...

Страница 15: ...HECKED LOOSE CONNECTIONS CAN CAUSE PROBLEMS WARNING THIS APPLIANCE MUST BE EARTHED 1 Any exposed pipe work must be earthed in accordance with IEE regulations 2 On completion of installation all electr...

Страница 16: ...ING SHOWING 1 ELEMENTS 2 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CALL SIGNAL INTO SL TERMINAL IMPORTANT...

Страница 17: ...Tel 0161 620 6677 13 INTERNAL WIRING SHOWING 3 ELEMENTS 6 9 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CAL...

Страница 18: ...0161 620 6677 14 INTERNAL WIRING SHOWING 4 ELEMENTS 11 12 KW MODEL IMPORTANT When fitting programmer always connect to boiler as shown in wiring diagram IMPORTANT REMOVE LINK WIRE A WHEN WIRING CALL...

Страница 19: ...By www heating spares co Tel 0161 620 6677 MODEL SUPPLY BOILER RATING CURRENT MCB RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50A 12Kw 51A 63A 15 WIRING DIAGRAM FOR HEATING ONLY GREY SL FIG...

Страница 20: ...w heating spares co Tel 0161 620 6677 16 WIRING DIAGRAM FOR Y PLAN CONTROL SYSTEM MODEL SUPPLY RATING BOILER CURRENT MCB RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50A 12 Kw 51A 63A ORANGE...

Страница 21: ...heating spares co Tel 0161 620 6677 17 WIRING DIAGRAM FOR S PLAN CONTROL SYSTEM FIG 21 GREY SL ORANGE FIG 21 MODEL SUPPLY RATING BOILER CURRENT RCD 2 Kw 8 5A 13A 6 Kw 25A 32A 9 Kw 39A 40A 11 Kw 45A 50...

Страница 22: ...element 6 With all elements disconnected again taking note of wiring arrangement carefully disconnect and remove the element cables from the PCB Important care MUST be taken when handling the PCB 7 Di...

Страница 23: ...on bottom of boiler then carefully remove top bracket 8 Boiler unit can now be carefully removed 9 Remove eight fixing screws on top flange and with draw element assembly 10 Remove bottom element posi...

Страница 24: ...d By www heating spares co Tel 0161 620 6677 20 WIRING ARRANGEMENTS FOR AZTEC 11 12 KW MODELS ON AZTEC 6 9KW MODELS ELEMENT 1 CONNECTIONS ARE NOT USED ELEMENT JUMPER NOT USED ON 6 9 KW BOILERS FIG 24...

Страница 25: ...here is a break in the element cable this would show up as a fault Check all element cables and connections PCB Running Temperature The PCB control unit has a built in temperature control sensor which...

Страница 26: ...ares co Tel 0161 620 6677 18 8 10 11 2 21 20 1 14 9 12 19 15 7 22 17 18 5 16 17 16 18 11 10 6 23 4 18 3 25 24 B L N E A C A B C 19 13 24 25 12 19 33 31 22 29 27 30 26 43 34 28 35 39 38 32 40 35 16 16...

Страница 27: ...W 1 221880 3 E94 759 PCB Control Unit 2kW 1 222558 3 E94 760 PCB Control Unit 6 9 11 12 kW 1 221823 4 E94 761 2 kW Electric Element 2 kW boiler 1 221838 4 E94 762 2 kW Electric Element 6 kW boiler 3 2...

Страница 28: ...uk Trianco Limited Copyright in this brochure and the drawings or illustrations contained in it is vested in Trianco Limited and neither the brochure or any part thereof may be reproduced without pri...

Отзывы: