INSTRUCTION MANUAL
7
_____________________________________________________________________________________________________________________
7.
Balance preparation to work
1.
Unpack balance, removing protective
foils.
2.
Place balance on flat, horizontal
foundation, in place not subjected to
mechanical vibrations and strong air
movements. Take care if the scale stays
on all four legs.
3.
Air bubble in level should be located
in the middle position.
Good Bad
4.
Lift scale corners up and put locks
under in such a way that scale legs go
into prepared holes.
5.
Mount locks permanently to the
ground using o10 holes.
6.
Put balance approaches on settling
them into locks.
7.
Unscrew transport handles (mounted
for transport).
8.
Connect the supply cable plug to
socket with protective contact, when
balance is unloaded.
9.
In hermetic scales clog unused
connectors with additional caps.