![AWE MODELS II Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/awe/models-ii/models-ii_quick-start-manual_3035330010.webp)
- Page - 10 -
ADVANCED WATER ENGINEERING, INC.
Indian Harbour Beach, FL
www.advancedwater.com
B. Drilling a
Ceramic
Tile
Counter
1.
Take off the ceramic layer of the tile using a silicon carbide grinding wheel. Grind away
enough of the material to accommodate a 1-1/4” carbide drill
bit.
2.
Operate the drill at low speeds, especially when the bit is about to penetrate the tile.
C. Drilling Stainless Steel Sinks
1.
Determine faucet locations and center punch the stainless for the drill bit.
2. After drilling a pilot hole using a high speed carbide bit, increase the bit size until you
have drilled a hole at least 1-1/4” in diameter.
Step-by-step assembly:
STEP 1
Read all instructions before beginning installation. Verify that all parts have been received.
STEP 2
Prepare mounting hole:
See instructions from previous column.
Use existing third hole in sink if available.
Содержание MODELS II
Страница 1: ...AWE LINE PRESSURE REVERSE AWE LINE PRESSURE REVERSE OSMOSIS DRINKING WATER SYSTEMS MODELS II III ...
Страница 14: ... Page 14 ADVANCED WATER ENGINEERING INC Indian Harbour Beach FL www advancedwater com ...
Страница 15: ... Page 15 ADVANCED WATER ENGINEERING INC Indian Harbour Beach FL www advancedwater com ...