- Page - 6 -
ADVANCED WATER ENGINEERING, INC.
Indian Harbour Beach, FL
www.advancedwater.com
7.
CONNECTING THE COMPONENTS
Each component on the R.O. filter assembly connection is made by following the Fast-Tite®
assembly instructions on page 6-7.
A. Connect yellow tubing from raw water supply valve to the inlet pre-filter. (Refer to Figure 1 &
2).
B. Connect
BLUE
tubing to the product water tee on post filter to faucet. (Refer to Figure 2).
C. Connect
1/4” BLACK
tubing to faucet air gap and
3/8” RED
tubing from faucet air gap to
drain.
8. START-UP PROCEDURE
A. Turn on the feed water valve and watch
carefully
for leaks.
B.Turn on the storage tank valve and check for leaks.
C.
Correct any leakage problems as necessary.
CAUTION: Do not use the first gallon of water
from
faucet or from the icemaker. This first
gallon
of
water flushes the entire system, removing any preservatives used during shipping
and storage,
preparing
it to produce R.O. water.
SECTION 3
Service Instructions
Pre-Filter Replacement
1 Turn
off water valve and storage tank valve.
2. Open faucet to release pressure.
3. Unscrew the white pre-filter housing.
4. Replace pre-filter. (Replacement part number found on filter housing.)
5. Clean housing, if necessary, with a mild chlorine solution. Rinse away all chlorine before
reassembly.
6. Before reinstalling pre-filter, make certain 0-ring is seated in housing.
Содержание MODELS II
Страница 1: ...AWE LINE PRESSURE REVERSE AWE LINE PRESSURE REVERSE OSMOSIS DRINKING WATER SYSTEMS MODELS II III ...
Страница 14: ... Page 14 ADVANCED WATER ENGINEERING INC Indian Harbour Beach FL www advancedwater com ...
Страница 15: ... Page 15 ADVANCED WATER ENGINEERING INC Indian Harbour Beach FL www advancedwater com ...