A V G 9 .0 A nti- V irus Bus ines s E dition © 2 0 0 9 C opyright A V G T ec hnologies C Z, s .r.o. A ll rights res erved.
1 3 1
schedule.
·
The Report Schedule is active
- use this function to activate or disable
selected report(s).
·
Remove
- removes selected reports from AVG DataCenter.
By default, there are no schedules available. To prepare a new scheduled report,
right-click in the Report schedules area and select the
Define a new schedule
item
from the menu.
A new dialog will come up: