![Avaya Virtual Services Platform 7200 Series Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/avaya/virtual-services-platform-7200-series/virtual-services-platform-7200-series_installation-manual_3028206017.webp)
Warning:
If you pull the switch all the way out on the slide rails, there is a danger of the rack tipping over.
For more information and guidelines, see
Important notice about rack safety
.
Installing slides in a 300mm-600mm equipment rack
Use the following procedure to install your switch in an equipment rack with a depth between
300mm and 600mm.
Procedure
1. Disconnect the power cord from the switch.
2. Use the following steps to detach the chassis rail from the slide’s rack rail:
a. Pull the inner chassis rail and slide it out as far as you can.
b. Slide the white release lock in the direction of the arrow stamped on the lock.
January 2015
Installation Job Aid for Avaya Virtual Services Platform 7200 Series
17