
Recommended tools and supplies
You may need the following items to install the server in a 4–post rack:
• #2 crosspoint (Phillips) screwdriver
• Masking tape or felt-tip pen for marking the mounting holes.
Safety instructions
Use the following safety guidelines to ensure your own personal safety and to help protect your
system and working environment from potential damage.
Observe the following precautions for rack stability and safety. Also refer to the rack installation
documentation accompanying the rack for specific caution statements and procedures.
Systems are considered to be components in a rack. Thus, "component" refers to any system
as well as to various peripherals or supporting hardware.
Caution:
Before installing systems in a rack, install front and side stabilizers on stand-alone racks or
the front stabilizer on racks joined to other racks. Failure to install stabilizers accordingly
before installing systems in a rack could cause the rack to tip over, potentially resulting in
bodily injury under certain circumstances. Therefore, always install the stabilizer(s) before
installing components in the rack.
After installing system/components in a rack, never pull more than one component out of
the rack on its slide assemblies at one time. The weight of more than one extended
component could cause the rack to tip over and may result in serious injury.
Note:
Your system is safety-certified as a free-standing unit and as a component for use in a rack
cabinet using the customer rack kit. It is your responsibility to ensure that the final
combination of system and rack complies with all applicable safety standards and local
electric code requirements.
System rack kits are intended to be installed in a rack by trained service technicians.
Caution:
Always load the rack from the bottom up, and load the heaviest item in the rack first.
Make sure that the rack is level and stable before extending a component from the rack.
Use caution when pressing the component rail release latches and sliding a component into
or out of a rack; the slide rails can pinch your fingers.
Do not overload the AC supply branch circuit that provides power to the rack. The total rack
load should not exceed 80 percent of the branch circuit rating.
S8510 Server
Installing and Configuring Avaya Aura
™
System Platform
April 2010 17
Содержание Aura System Platform
Страница 1: ...Installing and Configuring Avaya Aura System Platform Release 1 1 1 April 2010...
Страница 4: ...4 Installing and Configuring Avaya Aura System Platform April 2010...
Страница 8: ...8 Installing and Configuring Avaya Aura System Platform April 2010...
Страница 12: ...System Platform installation 12 Installing and Configuring Avaya Aura System Platform April 2010...
Страница 40: ...Server installation and connectivity 40 Installing and Configuring Avaya Aura System Platform April 2010...
Страница 60: ...Installing System Platform using laptop 60 Installing and Configuring Avaya Aura System Platform April 2010...
Страница 74: ...Configuring the SAL Gateway 74 Installing and Configuring Avaya Aura System Platform April 2010...
Страница 82: ...Troubleshooting the installation 82 Installing and Configuring Avaya Aura System Platform April 2010...
Страница 104: ...104 Installing and Configuring Avaya Aura System Platform April 2010...