OPERATION TIME PROGRAMMING FOR TWO LEAFED SWINGING GATE WITH SLOW SPEED
Set trimmer
TORQUE
at minimum needed to move the door leaf correctly and adjust trimmer
for slow
speed at minimum needed to move the door leafs
.
Totally close the door.
Press
PROGR
for at least 3 seconds.
TEST LED
starts blinking.
Release
Press
START:
The first leaf starts moving at normal speed.
When you want to start slow speed press
START:
Slow speed mode has began.
When first leaf is totally open press
START:
The second leaf starts opening at normal speed.
When you want to start slow speed for the second leaf press
START:
Slow speed has began.
When the second leaf is totally open press
START:
The second leaf starts closing at normal speed.
When you want to start slow speed for the second leaf press
START:
Slow speed has began.
When the second leaf is totally closed press
START:
The first leaf starts closing at normal speed.
When you want to start slow speed for the first leaf press
START:
Slow
When the firtst leaf is totally closed press
START.
Press
START:
the first leaf starts opening and when you decide that the time interval between the opening of
the two leafes is enough press
START
again
:
The second leaf starts opening.
Press
START:
The second leaf starts closing and when you decide that the time interval between the closing of
the two leafes is enough press
START
again
:
The first leaf starts closing.
Wait until the
TEST LED
turns off.
The operation time programming is complete.
The next time the door will open will be according to the settings just completed.
ATTENTION:
After RESET or power supply failure, at the first closing of the door the operation time will be greater
(approximately 12 seconds)
correctly
PROGR
speed has began.
SLOW
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1
2
START
3
START
4
START
5
START
6
START
7
START
8
START
9
START
10
START
11
START
12
START
13
START
M2
M1
1
START
First START command initiates
the operation time programming
causing the first motor to OPEN.
Second START command defines the point
at which slow speed begins
for the first motor while opening.
Third START command defines
the end of first motor operation time
and must be issued when the door
totally opens.
Fourth START command defines
the starting point for slow speed
for the second motor while opening.
Fifth START command defines
the end of the second motor
operation time and must be issued
when the doors totally opens.
Sixth START command defines
starting point for slow speed for the
second motor while closing.
Seventh START command defines
the end of the second motor
operation time and must be issued
when the door totally closes.
Eighth START cpmmand defines
the starting
point for slow speed for the first motor
while closing.
Ninth START command defines
the end of the first motor operation time
and must be issued when the door
totally closes.
Tenth START command initiates
the programming for the operation time
interval between the
two leafs of the door when opening.
Eleventh START command starts the
second motor after the desired time interval
between the opening of the two motors.
Thirteenth START command starts the
first motor for the operation time interval
between the two leafs of the door
when closing.
Twelfth START command initiates
the programming for the operation time
interval between the two leafs
of the door when closing.
5