36
7. Install new piston, seals, and rod wiper.
8. Install and tighten piston head nut to 325
ft•lb of torque. Upper clevis and pin may be used to prevent
rotation of rod while tightening.
9. Liberally lubricate piston and seal with clean grease or oil.
10. Insert piston into barrel, taking care not to damage seal.
11. Slip bearing assembly into place and align retainer hole with slot in barrel.
12. Turn bearing with spanner wrench until retainer is reinserted completely.
6.3.1.3.
Placing Cylinder Back Into Service
Loctite PST #567 pipe thread sealant or equivalent is recommended.
Do not use Teflon tape on hydraulic threaded connections.
Tape fragments may damage hydraulic system.
Autoquip recommends replacing any NPT fittings that have been disassembled due to their inherent
design for sealing.
1. Check that lift anchors are tight (when used). Check all pins and other mechanical and hydraulic
connections.
2. Restore oil level. See oil recommendations in
“Oil Requirements” section.
3. Turn on electrical power and pre
ss “UP” button. Loosen bleeder plug at the top end of ram casing and
operate pump to remove trapped air from ram. When clear oil appears, tighten plug and raise lift
slightly to disengage maintenance locks.
4. Lower lift completely and hold
“DOWN” button for 60 seconds to allow air in cylinders to bleed back
into reservoir.
5.
See “Bleeding Air From System” section
6.3.2
Bleeding Air From System
1. Bleed air from system by raising lift 25-50% of full travel, then lower
completely.
2.
Hold “DOWN” button for 60 seconds.
3. Repeat procedure 8-10 times. If this does not bleed all air from system,
contact Autoquip.
4. Clean up any spilled oil. Dispose of spilled oil in an environmentally safe
manner.
6.3.3
Hydraulic Velocity Fuse and Flow Control (VF/FC) Replacement
NOTICE
Содержание PLTC-58120
Страница 13: ...13 1 DECAL_CAPACITY 2 36430050 3 36401487 4 36401560 5 06100010...
Страница 14: ...14 6 36403225 7 36400265 8 36400257 9 36403720 10 36433670...
Страница 17: ...17 PLT Pit Detail See Pit Installation Notes...
Страница 19: ...19 Lifting and Installation...
Страница 22: ...22 4 6 Bridge Lifting Chain Installation Steel Bridge...
Страница 23: ...23 4 7 Bridge Lifting Chain Installation Aluminum Bridge...
Страница 24: ...24 4 8 Bridge Winch Installation Steel Bridge...
Страница 25: ...25 4 9 Bridge Winch Installation Aluminum Bridge...
Страница 26: ...26 4 10 Pit Modification Installation for Mechanical Wheel Chock...
Страница 30: ...30 Figure 6 1...
Страница 35: ...35 Figure 6 3 Cylinder Seals...
Страница 38: ...38 6 3 5 Schematics and Field Wiring Details Electric Schematic 5HP 3Ph Contractor or Vertical Power Unit...
Страница 39: ...39 Electric Schematic 5HP 3Ph Continuous Running Vertical Power Unit...
Страница 40: ...40 Electric Schematic 5HP 1Ph 230V Vertical Power Unit...
Страница 41: ...41 Electric Schematic 3HP 1Ph 115V Vertical Power Unit...
Страница 42: ...42 Hydraulic Schematic Contractor Power Unit...
Страница 43: ...43 Hydraulic Schematic Vertical Power Unit...
Страница 44: ...44 Hydraulic Schematic Continuous Running Vertical Power Unit...
Страница 45: ...45 Push Button Wiring Diagram...
Страница 46: ...46 Guarded Foot Switch Wiring Diagram...
Страница 47: ...47 Guarded Foot Switch Assembly...
Страница 48: ...48 Optional Limit Switch Mounting Diagram PLTC 6050 to 6060...
Страница 49: ...49 Optional Limit Switch Mounting Diagram PLTC 6070 to 58150...
Страница 54: ...54 7 PARTS LISTS Contractor Power Unit...
Страница 55: ...55 Vertical Power Unit...
Страница 56: ...56 Continuous Running Vertical Power Unit...