11
Pressurized fluids can penetrate the skin.
Hydraulic hoses can fail from age, damage and exposure.
Do not search for hydraulic leaks without body and face protection. A tiny,
almost invisible leak can penetrate the skin, thereby requiring immediate
medical attention.
Use wood or cardboard to detect hydraulic leaks, never your hands.
Spilled fluids and lubricants may be slippery and may also present
a fire hazard.
Clean up spilled fluids and lubricants.
3.5
Maintenance
Prevent serious injury or death.
Disconnect and/or lock out electrical supply to power unit prior to any
maintenance being performed.
Prevent serious injury or death.
Never go under lift platform until load is removed and scissors
mechanism is securely blocked in raised position with
maintenance devices.
3.6
Modifications
Prevent serious injury or death.
Do not modify lift. Autoquip cannot foresee and is not responsible for
injury or damage which results from unauthorized modifications or
misuse of lift.
i
WARNING
i
WARNING
i
WARNING
i
WARNING
Содержание PLTC-58120
Страница 13: ...13 1 DECAL_CAPACITY 2 36430050 3 36401487 4 36401560 5 06100010...
Страница 14: ...14 6 36403225 7 36400265 8 36400257 9 36403720 10 36433670...
Страница 17: ...17 PLT Pit Detail See Pit Installation Notes...
Страница 19: ...19 Lifting and Installation...
Страница 22: ...22 4 6 Bridge Lifting Chain Installation Steel Bridge...
Страница 23: ...23 4 7 Bridge Lifting Chain Installation Aluminum Bridge...
Страница 24: ...24 4 8 Bridge Winch Installation Steel Bridge...
Страница 25: ...25 4 9 Bridge Winch Installation Aluminum Bridge...
Страница 26: ...26 4 10 Pit Modification Installation for Mechanical Wheel Chock...
Страница 30: ...30 Figure 6 1...
Страница 35: ...35 Figure 6 3 Cylinder Seals...
Страница 38: ...38 6 3 5 Schematics and Field Wiring Details Electric Schematic 5HP 3Ph Contractor or Vertical Power Unit...
Страница 39: ...39 Electric Schematic 5HP 3Ph Continuous Running Vertical Power Unit...
Страница 40: ...40 Electric Schematic 5HP 1Ph 230V Vertical Power Unit...
Страница 41: ...41 Electric Schematic 3HP 1Ph 115V Vertical Power Unit...
Страница 42: ...42 Hydraulic Schematic Contractor Power Unit...
Страница 43: ...43 Hydraulic Schematic Vertical Power Unit...
Страница 44: ...44 Hydraulic Schematic Continuous Running Vertical Power Unit...
Страница 45: ...45 Push Button Wiring Diagram...
Страница 46: ...46 Guarded Foot Switch Wiring Diagram...
Страница 47: ...47 Guarded Foot Switch Assembly...
Страница 48: ...48 Optional Limit Switch Mounting Diagram PLTC 6050 to 6060...
Страница 49: ...49 Optional Limit Switch Mounting Diagram PLTC 6070 to 58150...
Страница 54: ...54 7 PARTS LISTS Contractor Power Unit...
Страница 55: ...55 Vertical Power Unit...
Страница 56: ...56 Continuous Running Vertical Power Unit...