10
Prevent serious injury or death.
Scissor lifts are designed for a specific load and application. Do not
change load or application from original design.
Overloading, or uneven loading, could result in load instability and cause
serious personal injury.
Stay clear of lift while lift is in motion.
Never stand, sit or ride on lift unless equipped with OSHA-compliant
personnel guarding on the platform.
Prevent serious injury or death.
Lifts which travel to an elevation above floor level where distance between
floor and the underside of lift platform exceeds 66" must have the
scissors mechanism guarded per ANSI MH29.1.
3.4
Hydraulics
Fluids can be hazardous. Before servicing lift, check Material Safety Data Sheet (MSDS) to understand
the product, safe handling procedures, and first aid measures relating to product. Follow this information
when servicing or repairing lift.
Do not drain or pour any fluids or lubricants into ground. Check with local environmental agencies,
recycling centers, or your Autoquip dealer for correct disposal information.
Any time velocity fuses have been tripped, investigate cause of trip and
verify necessary corrective actions have been taken prior to operation of
lift.
Prevent serious injury or death.
Do not attempt to remove Hydraulic Velocity Fuse (HVF) until maintenance
device securely supports lift and all hydraulic pressure has been relieved.
HVF is attached to elbow fitting in pressure port of cylinder. Do not use a
swivel fitting between HVF and cylinder. If HVF is installed improperly, it
will not lock up in event of a hydraulic line failure.
i
WARNING
i
WARNING
i
CAUTION
i
WARNING
i
WARNING
Содержание PLTC-58120
Страница 13: ...13 1 DECAL_CAPACITY 2 36430050 3 36401487 4 36401560 5 06100010...
Страница 14: ...14 6 36403225 7 36400265 8 36400257 9 36403720 10 36433670...
Страница 17: ...17 PLT Pit Detail See Pit Installation Notes...
Страница 19: ...19 Lifting and Installation...
Страница 22: ...22 4 6 Bridge Lifting Chain Installation Steel Bridge...
Страница 23: ...23 4 7 Bridge Lifting Chain Installation Aluminum Bridge...
Страница 24: ...24 4 8 Bridge Winch Installation Steel Bridge...
Страница 25: ...25 4 9 Bridge Winch Installation Aluminum Bridge...
Страница 26: ...26 4 10 Pit Modification Installation for Mechanical Wheel Chock...
Страница 30: ...30 Figure 6 1...
Страница 35: ...35 Figure 6 3 Cylinder Seals...
Страница 38: ...38 6 3 5 Schematics and Field Wiring Details Electric Schematic 5HP 3Ph Contractor or Vertical Power Unit...
Страница 39: ...39 Electric Schematic 5HP 3Ph Continuous Running Vertical Power Unit...
Страница 40: ...40 Electric Schematic 5HP 1Ph 230V Vertical Power Unit...
Страница 41: ...41 Electric Schematic 3HP 1Ph 115V Vertical Power Unit...
Страница 42: ...42 Hydraulic Schematic Contractor Power Unit...
Страница 43: ...43 Hydraulic Schematic Vertical Power Unit...
Страница 44: ...44 Hydraulic Schematic Continuous Running Vertical Power Unit...
Страница 45: ...45 Push Button Wiring Diagram...
Страница 46: ...46 Guarded Foot Switch Wiring Diagram...
Страница 47: ...47 Guarded Foot Switch Assembly...
Страница 48: ...48 Optional Limit Switch Mounting Diagram PLTC 6050 to 6060...
Страница 49: ...49 Optional Limit Switch Mounting Diagram PLTC 6070 to 58150...
Страница 54: ...54 7 PARTS LISTS Contractor Power Unit...
Страница 55: ...55 Vertical Power Unit...
Страница 56: ...56 Continuous Running Vertical Power Unit...