Wiring information

Power supply

The standard IC9 requires a 230 
volt 50 Hz supply. This is powered 
from the L3 phase and Neutral 
internally.

Wiring

Electrical and communication 
connections are made directly to 
the back of the meter.

The main electrical connections are 
made to terminals 1-16 at the lower 
half of the meter, Communication 
Modbus 485 connections are made 
via the two sockets at the top of the 
meter on the side. Please see dia 2. 

Programming  
the CT Ratio '13'

To programme the CT Ratio the 
dill switch number "8" on the 
lower dill switch block must be in 
the "On" position

See diagram 6 for position of dill 
switches.

Connect power to the meter.

To programme, press the 
function key on the front of the 
meter, which will then take you 
into the display sequences for 
programming the CT Ratios.

You should now see the screen 
below

Diagram 3: 

Programming Screen

(a) You will notice the cursor 
flashing on the first "zero", by 
pressing the "Energy" key the 
zero will change to 1, if you 

press 

the "Energy" key again it will 
change to 2 and so on. 

(b) If you go past your number 
continue going through the 
numbers until the number you 
require reappears. Stop at your 
correct number '1'.

(c) Press the "Enter" key and the 
flashing cursor will move to the 
right. Stop at number '3'. Press 
function.

Diagram 4 : 

CT Setting Screens

(d) Repeat steps (a) to (c) to enter 
the correct programming details 
for your chosen CT ratios.

(e) When the process is complete 
press the "Function" key to take 
you back to the default screen.

Note: When setting CT ratios and 
if you have only three digits you 
must enter "0" as the first digit. 
e.g. 100/5 would be entered as 
0100/5.

When you have programmed the 
meter, disconnect the power to 
the meter and ensure dill switches 
are set to the 'OFF' position.

Operating 
information

Power on

After you have programmed the 
meter and you have put power 
onto the meter, the first screen 
to appear will indicate details of 
the meter and your programmed 
parameter values. After 10 
seconds will revert to normal 
default screen. "b"

a) Power On:  

 

 

 

 

 

 

 

b) Normal Default Display

 

 

 

 

 

 

 

Test Mode Display

At this stage it is advisable to check 
the connection to the meter, to do 
this please see page 6 function 50. 
This will enable you to see if the 
current transformers have been 
connected correctly and the three 
voltages are present.

Diagram 5: 

Connection Check Screen

 

 

 

 

 

 

 

The diagram above is showing 
that the current transformers 
are correct and the three phase 
voltages are correct.

If the current transformers are 
correct but the voltage on each 
phase is missing or below 200 
volts, then the screen will look as 
in the diagram below:

 

 

 

 

 

PLEASE ENTER

FUNCT I ON NUMBER

**

RAT I O

CT PR I MARY=**** / 5
NT PR I MARY=**** / 5

3

I MPORT ENERGY

KWH

= 000000.00

KVAH

= 000000.00

KVARH = 000000.00

CONNECT I ON

L 1 i mpo r t

V 1 ON

L2 i mpo r t

V2 ON

L3 i mpo r t

V3 ON

CONNECT I ON

L 1 i mpo r t

V 1 OFF

L2 i mpo r t

V2 OFF

L3 i mpo r t

V3 OFF

IC

3P4W 230/ 400V 50HZ

CT Rat io

****:5

NT Rat io

****:5

9

Содержание IC7-C

Страница 1: ...installation and operation manual IC7 C and IC9 C horizon r a n g e The fusion of land based metering and ether based monitoring 9...

Страница 2: ...ing Slide the back of the meter first through the opening on the rear side of the door and then push the bezel from the front side over the protruding clear plastic and push fully home until it locks...

Страница 3: ...t programming details for your chosen CT ratios e When the process is complete press the Function key to take you back to the default screen Note When setting CT ratios and if you have only three digi...

Страница 4: ...IMPORT ENERGY KWH 000000 00 KVAH 000000 00 KVARH 000000 00 EXPORT ENERGY KWH 000000 00 KVARH 000000 00 VOLTAGE L 1 000 0 L 1 L2 000 0 L2 000 0 L2 L3 000 0 L3 000 0 L3 L1 000 0 FREQUENCY 50 00Hz AMPS L...

Страница 5: ...will take you to the desired screen To return to the normal screen press FUNCTION key again If you enter an incorrect number or a function which is not available on this model you will see the screen...

Страница 6: ...50 To check connections enter function 50 See Page 5 function operation display Press Funct key to see connections Press Funct key to return to normal display PULSE TEST Function 60 To test the relay...

Страница 7: ...ches needs to be in the on position To allocate meter register number 14 dill switches numbers 5 6 and 7 must be in the on position To allocate meter register number 39 dill switches numbers 3 6 7 and...

Страница 8: ...se Duration 80 100 ms closure Pulse Value C T Value less than 1000 5A 1 kWh imp C T Value 1000 5A or more than 10 kWh imp 0 4 0 3 0 2 0 1 0 1 0 2 0 3 0 4 0 1 1 0 2 0 3 0 4 0 5 0 6 0 IC9 Load Curve 0 5...