installation and operation manualIC7-C and IC9-C
horizon
r a n g e
The fusion of land based metering and ether based monitoring
9
Страница 1: ...installation and operation manual IC7 C and IC9 C horizon r a n g e The fusion of land based metering and ether based monitoring 9...
Страница 2: ...ing Slide the back of the meter first through the opening on the rear side of the door and then push the bezel from the front side over the protruding clear plastic and push fully home until it locks...
Страница 3: ...t programming details for your chosen CT ratios e When the process is complete press the Function key to take you back to the default screen Note When setting CT ratios and if you have only three digi...
Страница 4: ...IMPORT ENERGY KWH 000000 00 KVAH 000000 00 KVARH 000000 00 EXPORT ENERGY KWH 000000 00 KVARH 000000 00 VOLTAGE L 1 000 0 L 1 L2 000 0 L2 000 0 L2 L3 000 0 L3 000 0 L3 L1 000 0 FREQUENCY 50 00Hz AMPS L...
Страница 5: ...will take you to the desired screen To return to the normal screen press FUNCTION key again If you enter an incorrect number or a function which is not available on this model you will see the screen...
Страница 6: ...50 To check connections enter function 50 See Page 5 function operation display Press Funct key to see connections Press Funct key to return to normal display PULSE TEST Function 60 To test the relay...
Страница 7: ...ches needs to be in the on position To allocate meter register number 14 dill switches numbers 5 6 and 7 must be in the on position To allocate meter register number 39 dill switches numbers 3 6 7 and...
Страница 8: ...se Duration 80 100 ms closure Pulse Value C T Value less than 1000 5A 1 kWh imp C T Value 1000 5A or more than 10 kWh imp 0 4 0 3 0 2 0 1 0 1 0 2 0 3 0 4 0 1 1 0 2 0 3 0 4 0 5 0 6 0 IC9 Load Curve 0 5...
Страница 9: ...n depth stock holding combine to provide a level of service which has earned the appreciation of customers across the spectrum of the UK and export markets Computerised distribution systems are geared...