10
NeoSlider™ - Sliding Gate Opener NES-24V1
Owner Installation Instructions
Rack Installation
04
fi g
Mounting rack to gate
A strong base on the gate is required for mounting
the rack.
1. Manually open the gate and place a rack section to
mesh with the pinion gear on the Drive Unit. Mark
the top of the rack. Move the gate and mark the rack
for the entire length of the gate.
2. Position the top edge of the rack on this line and
mark the centres of the rack’s mounting slots. The
fi rst section of rack should start 20mm from the edge
of the gate.
3. Drill and tap for 6mm (¼”) screws.
4. Once the fi rst section of the rack is mounted, check
that it meshes with the NeoSlider™ pinion gear.
5. When joining subsequent sections of rack, check the
mesh by placing a spare section upside down (teeth
facing upwards) and putting it into mesh with the
racks being joined
(Fig. 05).
6. Tighten the racks. This will ensure that the NeoSlider™
pinion can run along the racks without obstruction.
05
fi g
Rack
width
Gate
Rack
Drive gear
Datum line
To top of pinion
To bottom of
rack tooth
Maximum height of rack