12. Fit cover [1] and fasten screws [2] evenly crosswise.
13.2.2.
Disconnection from the mains with KP/KPH and KES electrical connection
Ignition of potentially explosive atmospheres caused by sparks!
Risk of death or serious injury!
→
Before opening the flameproof enclosure, ensure absence of gas and voltage.
→
Wait for 30 seconds after power cut-off prior to opening the housing.
→
Handle cover and housing parts with care.
→
Flameproof joints must neither be damaged nor soiled in any way.
→
Do not jam cover during fitting.
Figure 93: KP/KPH and KES electrical connection
[1]
Cover
[2]
Screws for housing
[3]
O-ring
[4]
Plug-in frame (KP/KPH)
[5]
Connection frame (KES)
Removing the plug:
1.
Loosen the screws [2].
2.
Remove electrical connection.
➥
Cover [1] and plug-in type frame [4] or connection frame [5] remain together.
3.
Seal open plug/socket connection, e.g. using AUMA protection cover and
parking frame.
Fitting the plug/socket
connector:
4.
Clean sealing faces of plug/socket connector and housing.
5.
Preserve joint surfaces with an acid-free corrosion protection agent.
6.
Check whether O-ring [3] is in good condition, replace if damaged.
7.
Apply a thin film of non-acidic grease (e.g. petroleum jelly) to the O-ring and
insert it correctly.
8.
Replace electrical connection and fasten screws evenly crosswise.
13.3.
Maintenance
Maintenance intervals
In compliance with EN 60079-17, Ex certified products either require repeated testing
at an interval of 3 years or continuous monitoring by trained personnel.
85
SQVEx 05.2 – SQVEx 14.2/ SQRVEx 05.2 – SQRVEx 14.2 Control unit: electronic (MWG)
ACVExC 01.2 Modbus RTU
Servicing and maintenance