How to proceed
1.
Loosen screws [2] and remove cover [1].
2.
Insert cable glands suitable for connecting cables.
3.
Seal unused cable entries with approved plugs suitable for the required protec-
tion type.
6.4.2.
Cable connection
Table 16:
Terminal cross sections and terminal tightening torques
Tightening torques
Terminal cross sections
Designation
0.9 – 1.1 Nm
With small clamp washers:
1.5 – 4.0 mm
2
(flexible or solid)
Power contacts (U1, V1, W1)
Protective earth connection
(PE)
With large clamp washers:
2.5 – 6 mm
2
(flexible or solid)
0.5 – 0.7 Nm
0.75 – 1.5 mm
2
(flexible or solid)
Control contacts
(1 to 24, 31 to 40, 47 to 50, PE)
1.
Remove cable sheathing in a length of 120 – 140 mm.
2.
Insert the wires into the cable glands.
3.
Fasten cable glands with the specified torque to ensure required enclosure
protection.
Information: For shielded cables: Link the cable shield end via the cable gland
to the housing (earthing).
4.
Strip wires.
→
Controls max. 8 mm, motor 12 mm
5.
For flexible cables: Use wire end sleeves according to DIN 46228.
6.
Connect cables according to order-related wiring diagram.
Information: Two wires for each connection permitted.
→
When using motor cables with wire cross section of 1.5 mm²: Use small
clamp washers for connection to terminals U1, V1, W1 and PE (the small
clamp washers are in the cover of electrical connection upon delivery).
In case of a fault, electric shock due to presence of hazardous voltage if the
PE conductor is NOT connected!
Risk of death or serious injury!
→
Connect all protective earth conductors.
→
Connect PE connection to external protective earth conductor of connecting
cables.
→
Start running the device only after having connected the protective earth con-
ductor.
7.
Firmly tighten protective earth to PE connection.
Figure 35: PE connection
[1]
PE connection, control cable
[2]
PE connection, motor cable
35
SQVEx 05.2 – SQVEx 14.2/ SQRVEx 05.2 – SQRVEx 14.2 Control unit: electronic (MWG)
ACVExC 01.2 Modbus RTU
Electrical connection