Commissioning
In any case, commissioning must be performed by a member of the AUMA staff.
Prior to commissioning and test run, the following points must be observed:
-
Ensure that all electrical connections are correctly wired.
-
Ensure that the permissible supply voltages at power and signal plug
connections are not exceeded:
400V AC 3~N,PE
WARNING
During electrical operation, certain parts inevitably carry hazardous voltages.
Work on the electrical system or equipment must only be carried out by a
skilled electrician himself or by specially instructed personnel under the control
and supervision of such an electrician and in accordance with the applicable
electrical engineering rules.
For work on systems with hazardous voltages (e.g. EN 50178) as well for correct use of tools,
the general and regional installation and safety regulations must be met.
3.4 Warranty
AUMA are not liable for damage resulting from:
•
non-observance of the operation instructions,
•
unsuitable or improper use,
•
incorrect installation and/or commissioning by the buyer or
by third parties,
•
normal wear and tear
•
incorrect or careless handling,
•
chemical or electrochemical and electrical influences, as
long as they are not caused by a fault of AUMA,
•
improper modifications or repairs by the buyer or third
parties,
•
effects of parts which are not AUMA original parts.
•
4 Purpose
This document document describes the use of PV1644. The device is used for performing the
functional tests on AUMA controls, without the use of AUMA actuators.