![ATS US-2000 V5 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/ats/us-2000-v5/us-2000-v5_service-manual_3005199005.webp)
US
-
2000
(
DCP 2000 V
V5)
SERVICE MANUAL
CE
Fertigstellung: 02.16
US - 2000
g
g
Serviceanleitung_US2000V5_EN_V0.0.docx
Page 4 of 23
Maintenance
1.
Maintenance
Maintenance work must be performed exclusively by authorised personnel. The machine must always be turned
off and disconnected from the power grid prior to that!
The indicated maintenance interval refers to single shift operation in a normal environment.
1.1.
Monthly maintenance
Procedure:
1.
Fold down the front planel.
2. Remove
product
guides
3. Remove
rear
table
4.
Clean machine using compressed air or a vacuum cleaner.
5.
Blow out the arch using compressed air.
6.
One drop of oil each into the left and the right lead of the Anvil.
7.
One drop of oil each into the left and the right lead of the sonotrode.
8.
One drop of oil into the guide slot for the knife.
Important: Solvents or alcohol must never be used to clean the plastic arch