9 / 26
Section : 6 Initial Setup
6.1
Startup
Before performing startup, some prerequisites are necessary. Firstly, ensure the transmitter
wires are connected properly to the
ATS-LV 1000
controller. Make sure to check the clamping
of controller with panel plate.
6.2
Menu Tree
Before performing any operation kindly see the below sequential tree chart for quick access
Menu. For detailed information on sub menus kindly refer to (section: 8).