18
CHAPTER 3
Installation
3.1 Precaution
1. Only trained and qualified workers should operate forklift trucks,
cranes or similar equipment and apply slings.
2. Use only wires of dimensions specified in the manual. They must be
strong enough to support machine weight.
3. Before hoisting the machine, fixed each unit securely.
4. Maintain a clean and orderly surrounding around the machine.
5. “POWER ON” on the control panel can be pressed only after the complete
installation.
6. Be sure electrical cables and wires are not damaged during
installation.
7. After installation, proper capacity should be checked before
connection the wire to the power source.
8. Removing the anti-rusty oil by rags with paraffin or fuel oil before
operating. Toluene compounds must not be used.
9. Never leave the control boxes open while the power is on. A deadly high
voltage is present which can cause serious injury.
3. 2 Machine unwrapped:
1. Remove support blocks from the mill head, column (for counterweight), tool
changer and axes travel cover.
2.
Inspect all piping is connected, including the tank's water pipes
3.
Check all limit switches and stop blocks are not loose
4.
Check whether the sheet metal door is installed properly.
Содержание A1-3T
Страница 1: ...1 A Series CNC BED MILL OPERATION MANUAL...
Страница 9: ...9 CHAPTER 2 Machine Specification 2 1 Machine Dimension...
Страница 10: ...10...
Страница 11: ...11...
Страница 12: ...12...
Страница 14: ...14 2 3 Machine Travel...
Страница 15: ...15...
Страница 16: ...16...
Страница 17: ...17...
Страница 20: ...20...
Страница 21: ...21...
Страница 22: ...22...
Страница 34: ...34 Mill Head Operation Instructions for 3T 5T milling head...