2.15.1.1 Example of ERPS Settings
To allow the users to understand the setting up of ERPS on the EH75XX industrial managed switches, this
subsection provides an example of ERPS setup with four Atop
’s managed switches as shown in Figure 2.145
Assuming that the ring network has EH75XX A, EH75XX B, EH75XX C, and EH75XX D
.
There is an RPL between
EH75XX A and EH75XX B
.
Note that the figure is based on the EH7520 model but it is applicable to any of EH75XX
models
.
Figure 2.145 Example of Ring Topology for ERPS Setup (Example made on EH7520)
For each switch, please follow the procedure outline in previous section. First, enabling the ERPS and then add
the RAPS VLAN = 8
.
On each managed switch, the users can configure ARPS VLAN Setting according to Table
Table 2.52 Setting Configuration for Switch A, B, C and D
EHX7XXX
A
B
C
D
RAPS VLAN 8
8
8
8
ERPS RAPS Enabled Enabled
Enabled
Enabled
West Port
1
1
1
1
East Port
2
2
2
2
RPL Owner
Enabled Disabled Disabled Disabled
RPL Port
West
None
None
None
2.15.1.2 UERPS Settings
(
Optional
)
The following procedure outlines the
UERPS
Setting under the
ERPS Setting
.
You can follow them as an exercise
.
1. Prepare two managed switches
)
Switch A and Switch B
(.
We will use Port 7 and Port 8 on both switches for
redundancy
.
2. Connect Switch A and Switch B to the network or PC so that you can access them
.
For simplicity, the users
can use Port 1 for Web configuration on both switches
.
3. Open Device Management Utility (described in Chapter 5) and change the IP address of Switch B or both
switches such that the IP addresses will not be conflicting.
4. Open Switch A and B
’s Web UI and setup ERPS settings like the following
.
Enable ERPS, Log, and UERPS