background image

Installation, Operation & Maintenance Guide

 

Matterhorn 880/882 

8

1-888-MY-AIR11        CAG-06-21-003        AtmosAir.com

8. 

Using the ‘T’ Clamp features in the Q.C.P, flatten the T 
clamps first with your thumb and then flush with the Plier. 

This feature is so the Q.C.P will not fall back through the 
hole. Then tighten screws securely. 

9. 

Insert Tube(s) into the Matterhorn. Ensure that the Blue 
angled bracket is 

UNDER

 the Q.C.P.

10. 

Angle the Matterhorn into position with the 

BLUE

 tube 

bracket toward the semi-circular cut out.

11. 

Align Screws through the holes in Matterhorn and place 
Matterhorn into position.

12. 

Install wing nuts and snug down until gasket is  
half compressed.

Electrical Installation

AtmosAir Matterhorn 880/882 series systems require 
approximately 6 watts per tube. An internal 1-amp, slow-blow 
fuse protects the unit.

 

Follow proper electrical procedures, guidelines, and codes for 
providing power to the systems, including requirements for 

conduit, sufficient ampacity, phase balancing, etc. Electrical 
installation should be performed by a qualified electrician. 

 

Field-install a power plug outlet or junction box within 8 feet 
(2.5 m) of the unit(s). 

 

Each Matterhorn 880/882 series unit is typically shipped with 
a 10-foot power cord with a C-30 connector on one end and 
a 3-prong NEMA 5-15 plug on the other end. The plug can be 
cut off and wires stripped for junction box installations. 

Go to next step

NOTE: TUBE INSTALLATION NOT SHOWN IN THESE PICTURES.

Caution!

A non-functioning LED light may improperly indicate that the system 
is not functioning. Be sure to disconnect from the main power before 
performing maintenance or troubleshooting the system.

Dimensions on Next Page

Содержание Matterhorn 880

Страница 1: ...ts pure natural state where no pollution or contaminants exist while reducing energy use and emissions in the process AtmosAir com CAG 06 21 003 IMPORTANT Save this Document for Future Reference Warra...

Страница 2: ...booklet before beginning the installation Follow each installation or repair step exactly as shown and explained in this guide Observe all local state national and international electrical codes Pay...

Страница 3: ...tallation 5 Mechanical Installation Continued 6 Duct Cut Out and Quick Change Plate Procedure 7 Duct Cut Out and Quick Change Plate Procedure Continued 8 Electrical Installation 8 Installation Dimensi...

Страница 4: ...880 series equipment is designed for minimal maintenance efforts The 880 series has two components that require inspection and maintenance 1 AtmosAir Matterhorn 880 series base unit components 2 Ioniz...

Страница 5: ...ing the blue cap DO NOT TWIST THE TUBE OR MOVE THE EMITTER SCREEN DO NOT OVER TIGHTEN THE TUBE Once the tube is secure return the conductor strap to its normal position and ENSURE SOLID FLAT CONTACT I...

Страница 6: ...r Sales for bracket 8 Units should be installed to allow easy access for maintenance Install units so that the 5 step power adjustment knob and status light are easily accessible and visible 9 In the...

Страница 7: ...re 1 Always measure for clearances for the tubes and wires prior to any other steps Then place the Q C P in the appropriate area 2 Holding the Q C P in place use a marker to trace the INNER perimeter...

Страница 8: ...approximately 6 watts per tube An internal 1 amp slow blow fuse protects the unit Follow proper electrical procedures guidelines and codes for providing power to the systems including requirements for...

Страница 9: ...tion Operation Maintenance Guide Matterhorn 880 882 9 1 888 MY AIR11 CAG 06 21 003 AtmosAir com Contact Us 1 888 MY AIR11 1 888 692 4711 Matterhorn 880 882 Installation Operation and Maintenance Guide...

Страница 10: ...E NEUTRAL BLACK BROWN HOT 120V 240VAC SUPPLY PROVEN GOOD GROUND BLACK BROWN HOT 120V 240VAC SUPPLY M882 FIELD DO NOT SCALE DRAWING M 880 M882 FIELD WIRING DIAGRAM SHEET 1 OF 1 UNLESS OTHERWISE SPECIFI...

Страница 11: ...you with an annual service contract Recommended Maintenance Procedures Visually check the performance of the system by checking the red and green lights on the individual units If both lights are on t...

Страница 12: ...ng or other degeneration of the dielectric material that causes the dielectric to fail and arcing to occur Inspect the tube for black dots indicating failed dielectric 7 If physical inspection has not...

Страница 13: ...use a flathead screwdriver to pop the fuse drawer towards you Above Matterhorn 880 Ionization unit Here you will see there is one Ionization Tube installed towards the center of the device This shoul...

Страница 14: ...an and pure quality air that is typically found at higher mountain elevations AtmosAir s unique and proven air purification process significantly reduces mold controls the spread of bacteria and airbo...

Страница 15: ...GATIONS OF CLEAN AIR GROUP HERIN ARE EXPRESSLY GRANTED IN LIEU OF ALL WARRANTS WHETHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULA...

Отзывы: