Duct Cut-Out and Quick Change  

Plate Procedure

PLEASE READ ENTIRE PROCEDURE BEFORE STARTING:

Notes:

 

Utilize the Quick-Change Plate (Q.C.P.) in thin ducts, 

fiberboard ducts or where relatively frequent dismounts 

may occur. 

 

Additionally, the Q.C.P. may be used to compress loose 

fiberglass insulation and prevent damage due to airflow. 

 

It is not necessary to use the Q.C.P. in all instances. #10 
self-tapping screws are provided for other instances. Screw 
directly into duct. Use the Q.C.P. as the template for cut-out 
of duct. 

 

Provide enough electronic clearances for the tubes, no 
metal tube parts, or brackets may contact any part of the 
duct, 38.1mm (1.5”) of clearance is recommended.

Procedure:
1. 

Always measure for clearances for the tubes and wires prior to 
any other steps. Then, place the Q.C.P. in the appropriate area. 

2. 

Holding the Q.C.P. in place, use a marker to trace the 

INNER

 

perimeter as shown in the image in the bottom-left. *Skip the “T” 
clamp features when tracing*.

3. 

Before removing the Q.C.P., also use the marker to mark the 
center point of the 6 PEM-NUT holes.

4. 

Using appropriate tools, cut out the traced area in the duct. 

INSIDE PERIMETER

.

5. 

Drill out the 6 marked holes with a 5 mm (3/16”) or 6.5 mm (¼”) 
drill bit. 

NOTE

: The Q.C.P. is sized so it will 

JUST

 slip into duct at an 

angle as shown in the image in the bottom-right.

6.  DO NOT 

Screw in the 8-32 × 38.1mm (1.5”) long screws 

(provided) in from the 

BACK

 of the Q.C.P. until 

AFTER

 you 

have placed the Q.C.P into the duct through the cut-out.

7. 

Align the Q.C.P so that the PEM-NUTS are protruding into 

the duct, flat-side towards the duct wall. (This is so the 
Q.C.P will sit flush to the inside of a duct.) 

Continue on Next page

Содержание Matterhorn 880

Страница 1: ...ts pure natural state where no pollution or contaminants exist while reducing energy use and emissions in the process AtmosAir com CAG 06 21 003 IMPORTANT Save this Document for Future Reference Warra...

Страница 2: ...booklet before beginning the installation Follow each installation or repair step exactly as shown and explained in this guide Observe all local state national and international electrical codes Pay...

Страница 3: ...tallation 5 Mechanical Installation Continued 6 Duct Cut Out and Quick Change Plate Procedure 7 Duct Cut Out and Quick Change Plate Procedure Continued 8 Electrical Installation 8 Installation Dimensi...

Страница 4: ...880 series equipment is designed for minimal maintenance efforts The 880 series has two components that require inspection and maintenance 1 AtmosAir Matterhorn 880 series base unit components 2 Ioniz...

Страница 5: ...ing the blue cap DO NOT TWIST THE TUBE OR MOVE THE EMITTER SCREEN DO NOT OVER TIGHTEN THE TUBE Once the tube is secure return the conductor strap to its normal position and ENSURE SOLID FLAT CONTACT I...

Страница 6: ...r Sales for bracket 8 Units should be installed to allow easy access for maintenance Install units so that the 5 step power adjustment knob and status light are easily accessible and visible 9 In the...

Страница 7: ...re 1 Always measure for clearances for the tubes and wires prior to any other steps Then place the Q C P in the appropriate area 2 Holding the Q C P in place use a marker to trace the INNER perimeter...

Страница 8: ...approximately 6 watts per tube An internal 1 amp slow blow fuse protects the unit Follow proper electrical procedures guidelines and codes for providing power to the systems including requirements for...

Страница 9: ...tion Operation Maintenance Guide Matterhorn 880 882 9 1 888 MY AIR11 CAG 06 21 003 AtmosAir com Contact Us 1 888 MY AIR11 1 888 692 4711 Matterhorn 880 882 Installation Operation and Maintenance Guide...

Страница 10: ...E NEUTRAL BLACK BROWN HOT 120V 240VAC SUPPLY PROVEN GOOD GROUND BLACK BROWN HOT 120V 240VAC SUPPLY M882 FIELD DO NOT SCALE DRAWING M 880 M882 FIELD WIRING DIAGRAM SHEET 1 OF 1 UNLESS OTHERWISE SPECIFI...

Страница 11: ...you with an annual service contract Recommended Maintenance Procedures Visually check the performance of the system by checking the red and green lights on the individual units If both lights are on t...

Страница 12: ...ng or other degeneration of the dielectric material that causes the dielectric to fail and arcing to occur Inspect the tube for black dots indicating failed dielectric 7 If physical inspection has not...

Страница 13: ...use a flathead screwdriver to pop the fuse drawer towards you Above Matterhorn 880 Ionization unit Here you will see there is one Ionization Tube installed towards the center of the device This shoul...

Страница 14: ...an and pure quality air that is typically found at higher mountain elevations AtmosAir s unique and proven air purification process significantly reduces mold controls the spread of bacteria and airbo...

Страница 15: ...GATIONS OF CLEAN AIR GROUP HERIN ARE EXPRESSLY GRANTED IN LIEU OF ALL WARRANTS WHETHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULA...

Отзывы: